Line 52: | Line 52: | ||
* Look for camera at Blueberry site | * Look for camera at Blueberry site | ||
* replace antenna & coax @ blueberry site | * replace antenna & coax @ blueberry site | ||
− | + | * cross river by inflatable if water level is cooperative. | |
===For Datapro:=== | ===For Datapro:=== | ||
Add a PRI / NDVI Function: | Add a PRI / NDVI Function: | ||
* NDVI = (DownNIR/UpNIR - DownRed/UpRed)/(DownNIR/UpNIR + DownRed/UpRed) | * NDVI = (DownNIR/UpNIR - DownRed/UpRed)/(DownNIR/UpNIR + DownRed/UpRed) |
Revision as of 14:05, 6 September 2016
Contents
Fairbanks
To Buy:
- machine screws for sat transceiver
Teller Bottom @ TL_DS_1
To Do:
- Get Thermal Conductivity sensors running
- Jumper for batteries
- Pack up Surface Water Station for winter
- Duct seal up all instrument box holes
- Final Discharge Measurement of season
- serial numbers
In Nome Storage:
- jumpers for last battery
- soil sampling cylinders for soil pit
- Cable spools for Pressure transducers
- wading rod & cloth tape for discharge measurement
At Site
- duct seal for all connections
- soil pit sensors in large actionpacker
Extras
- think about how to mount iridium here...
- Bring covers from Fairbanks to cover unitstrut ends like tennis balls.
Left to fix
- Decagon SRS sensors... test again in Fairbanks
- Thermal Conductivity sensors... figure out their deal...
- Check out the wiring. Specifically, the original program guidance has a typo
- VX3 should be wired to SE11 but program says to SE12. (maybe... in any case, double-check)
- I have a single working here measuring temperature properly.
- Review fieldbook
Teller Top @ TL_IS5
Remaining To Do for fall
- Bring out a charge controller for solar panel
- soil samples from soil pit
- soil pit sensors are in a large actionpacker next to tower.
Kougarok M64
- Add ground control survey point
Skookum Pass
- Add Satellite Components
Kougarok Old Sites
- Download data over the radio network
Council Old Sites
- Look for camera at Blueberry site
- replace antenna & coax @ blueberry site
- cross river by inflatable if water level is cooperative.
For Datapro:
Add a PRI / NDVI Function:
- NDVI = (DownNIR/UpNIR - DownRed/UpRed)/(DownNIR/UpNIR + DownRed/UpRed)