Difference between revisions of "2016 NGEE September Nome Trip"
Jump to navigation
Jump to search
(12 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
− | ===Teller Bottom=== | + | ===Trip Recap=== |
+ | * Got Pits in at Teller top & Bottom | ||
+ | ** ran out of laptop battery, need to correct one more program error at teller bottom site in spring, program fixed on toughbook but not yet on logger. | ||
+ | * Installed ground control at Kougarok & logged for several hours | ||
+ | * Surveyed in a bunch of stuff in Council | ||
+ | * Surveyed in soil pits etc in Teller | ||
+ | * downloaded data from all 4 Kougarok area | ||
+ | ===Fairbanks=== | ||
+ | ====To Buy:==== | ||
+ | * machine screws for sat transceiver | ||
+ | |||
+ | ===Teller Bottom @ TL_DS_1=== | ||
+ | ====To Do:==== | ||
+ | * Get Thermal Conductivity sensors running | ||
+ | * Jumper for batteries | ||
+ | * Pack up Surface Water Station for winter | ||
+ | * Duct seal up all instrument box holes | ||
+ | * Final Discharge Measurement of season | ||
+ | * serial numbers | ||
+ | |||
====In Nome Storage:==== | ====In Nome Storage:==== | ||
* jumpers for last battery | * jumpers for last battery | ||
* soil sampling cylinders for soil pit | * soil sampling cylinders for soil pit | ||
+ | * Cable spools for Pressure transducers | ||
+ | * wading rod & cloth tape for discharge measurement | ||
====At Site==== | ====At Site==== | ||
Line 10: | Line 31: | ||
====Extras==== | ====Extras==== | ||
* think about how to mount iridium here... | * think about how to mount iridium here... | ||
− | *Bring covers from Fairbanks to cover unitstrut ends like tennis balls. | + | * Bring covers from Fairbanks to cover unitstrut ends like tennis balls. |
====Left to fix==== | ====Left to fix==== | ||
* Decagon SRS sensors... test again in Fairbanks | * Decagon SRS sensors... test again in Fairbanks | ||
* Thermal Conductivity sensors... figure out their deal... | * Thermal Conductivity sensors... figure out their deal... | ||
+ | ** Check out the wiring. Specifically, the original program guidance has a typo | ||
+ | ** VX3 should be wired to SE11 but program says to SE12. (maybe... in any case, double-check) | ||
+ | ** I have a single working here measuring temperature properly. | ||
* Review fieldbook | * Review fieldbook | ||
+ | |||
+ | ===Teller Top @ TL_IS5=== | ||
+ | ====Remaining To Do for fall==== | ||
+ | * Bring out a charge controller for solar panel | ||
+ | * soil samples from soil pit | ||
+ | * soil pit sensors are in a large actionpacker next to tower. | ||
===Kougarok M64=== | ===Kougarok M64=== | ||
− | * Add ground control survey point if | + | * Add ground control survey point |
+ | |||
+ | ===Skookum Pass=== | ||
+ | * Add Satellite Components | ||
+ | |||
+ | ===Kougarok Old Sites=== | ||
+ | * Download data over the radio network | ||
+ | |||
+ | ===Council Old Sites=== | ||
+ | * Look for camera at Blueberry site | ||
+ | * replace antenna & coax @ blueberry site | ||
+ | * cross river by inflatable if water level is cooperative. | ||
+ | |||
+ | ===For Datapro:=== | ||
+ | Add a PRI / NDVI Function: | ||
+ | * NDVI = (DownNIR/UpNIR - DownRed/UpRed)/(DownNIR/UpNIR + DownRed/UpRed) |
Latest revision as of 15:03, 19 September 2016
Contents
Trip Recap
- Got Pits in at Teller top & Bottom
- ran out of laptop battery, need to correct one more program error at teller bottom site in spring, program fixed on toughbook but not yet on logger.
- Installed ground control at Kougarok & logged for several hours
- Surveyed in a bunch of stuff in Council
- Surveyed in soil pits etc in Teller
- downloaded data from all 4 Kougarok area
Fairbanks
To Buy:
- machine screws for sat transceiver
Teller Bottom @ TL_DS_1
To Do:
- Get Thermal Conductivity sensors running
- Jumper for batteries
- Pack up Surface Water Station for winter
- Duct seal up all instrument box holes
- Final Discharge Measurement of season
- serial numbers
In Nome Storage:
- jumpers for last battery
- soil sampling cylinders for soil pit
- Cable spools for Pressure transducers
- wading rod & cloth tape for discharge measurement
At Site
- duct seal for all connections
- soil pit sensors in large actionpacker
Extras
- think about how to mount iridium here...
- Bring covers from Fairbanks to cover unitstrut ends like tennis balls.
Left to fix
- Decagon SRS sensors... test again in Fairbanks
- Thermal Conductivity sensors... figure out their deal...
- Check out the wiring. Specifically, the original program guidance has a typo
- VX3 should be wired to SE11 but program says to SE12. (maybe... in any case, double-check)
- I have a single working here measuring temperature properly.
- Review fieldbook
Teller Top @ TL_IS5
Remaining To Do for fall
- Bring out a charge controller for solar panel
- soil samples from soil pit
- soil pit sensors are in a large actionpacker next to tower.
Kougarok M64
- Add ground control survey point
Skookum Pass
- Add Satellite Components
Kougarok Old Sites
- Download data over the radio network
Council Old Sites
- Look for camera at Blueberry site
- replace antenna & coax @ blueberry site
- cross river by inflatable if water level is cooperative.
For Datapro:
Add a PRI / NDVI Function:
- NDVI = (DownNIR/UpNIR - DownRed/UpRed)/(DownNIR/UpNIR + DownRed/UpRed)