Difference between revisions of "SS Site Visit 2017-09-12"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 1: | Line 1: | ||
| + | Visited 9/12 and 9/14  | ||
* Check out 1m AT/RH  | * Check out 1m AT/RH  | ||
| + | ** 9/14 replaced with borrowed unit from toolik  | ||
* Bring out battery for UPS system  | * Bring out battery for UPS system  | ||
| + | ** double-check battery voltages next time out.  | ||
* toughbook  | * toughbook  | ||
| − | *   | + | * replaced bottom two wind sensors with new units  | 
| + | * sending old units for recalibration  | ||
* Tour with Go  | * Tour with Go  | ||
* put small toughbook on UPS system  | * put small toughbook on UPS system  | ||
| − | *  | + | * 9/14 changed all MD485s at site to Pakbus protocol rather than transparent to see if this helps with data retrieval using python.  | 
| + | * worked a bit on boardwalk  | ||
| + | * pounded in grounding rod  | ||
| + | * hooked second laptop to UPS  | ||
Latest revision as of 12:21, 14 September 2017
Visited 9/12 and 9/14
- Check out 1m AT/RH
- 9/14 replaced with borrowed unit from toolik
 
 - Bring out battery for UPS system
- double-check battery voltages next time out.
 
 - toughbook
 - replaced bottom two wind sensors with new units
 - sending old units for recalibration
 - Tour with Go
 - put small toughbook on UPS system
 - 9/14 changed all MD485s at site to Pakbus protocol rather than transparent to see if this helps with data retrieval using python.
 - worked a bit on boardwalk
 - pounded in grounding rod
 - hooked second laptop to UPS