SS Site Visit 2017-09-12
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
		
		
		
		
		
		
	
Visited 9/12 and 9/14
- Check out 1m AT/RH
- 9/14 replaced with borrowed unit from toolik
 
 - Bring out battery for UPS system
- double-check battery voltages next time out.
 
 - toughbook
 - replaced bottom two wind sensors with new units
 - sending old units for recalibration
 - Tour with Go
 - put small toughbook on UPS system
 - 9/14 changed all MD485s at site to Pakbus protocol rather than transparent to see if this helps with data retrieval using python.
 - worked a bit on boardwalk
 - pounded in grounding rod
 - hooked second laptop to UPS