Difference between revisions of "NGEE To Do Next Visit"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
* Re-level radiometers | * Re-level radiometers | ||
* Put out Divers for wells with Nathan | * Put out Divers for wells with Nathan | ||
+ | * Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook. | ||
+ | ** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements. | ||
+ | ** Also related: perhaps add a second string up at teller top? |
Revision as of 11:39, 17 May 2018
- Replace broken precip bucket @ Teller Bottom
- Replace broken precip bucket @ Koug m64
- Replace Desiccant deal for radiometers
- SR50A transducer replacement
- Bring out additional desiccant?
- Teller SW desiccant replacement
- Data Download
- Redrill hole for C1 Grid temperature probe
- Teller Bottom Program Send
- Re-level radiometers
- Put out Divers for wells with Nathan
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?