Difference between revisions of "NGEE To Do Next Visit"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
* Redrill hole for C1 Grid temperature probe | * Redrill hole for C1 Grid temperature probe | ||
* Teller Bottom Program Send | * Teller Bottom Program Send | ||
+ | * Measure Creek Flow | ||
* Re-level radiometers | * Re-level radiometers | ||
* Put out Divers for wells with Nathan | * Put out Divers for wells with Nathan |
Revision as of 07:39, 18 May 2018
- Replace broken precip bucket @ Teller Bottom
- Replace broken precip bucket @ Koug m64
- Replace Desiccant deal for radiometers
- SR50A transducer replacement
- Bring out additional desiccant?
- Teller SW desiccant replacement
- Data Download
- Redrill hole for C1 Grid temperature probe
- Teller Bottom Program Send
- Measure Creek Flow
- Re-level radiometers
- Put out Divers for wells with Nathan
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?