Difference between revisions of "NGEE To Do Next Visit"
Jump to navigation
Jump to search
| Line 1: | Line 1: | ||
| + | ===Seward Peninsula=== | ||
* Replace broken precip bucket @ Teller Bottom | * Replace broken precip bucket @ Teller Bottom | ||
* Replace broken precip bucket @ Koug m64 | * Replace broken precip bucket @ Koug m64 | ||
| Line 14: | Line 15: | ||
** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements. | ** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements. | ||
** Also related: perhaps add a second string up at teller top? | ** Also related: perhaps add a second string up at teller top? | ||
| + | |||
| + | |||
| + | ===Utqiagvik=== | ||
| + | * Intensive Site C HMP155 failed | ||
Revision as of 13:46, 23 May 2018
Seward Peninsula
- Replace broken precip bucket @ Teller Bottom
- Replace broken precip bucket @ Koug m64
- Replace Desiccant deal for radiometers
- SR50A transducer replacement
- Bring out additional desiccant?
- Teller SW desiccant replacement
- Data Download
- Redrill hole for C1 Grid temperature probe
- Teller Bottom Program Send
- Measure Creek Flow
- Re-level radiometers
- Put out Divers for wells with Nathan
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?
Utqiagvik
- Intensive Site C HMP155 failed