Difference between revisions of "NGEE To Do Next Visit"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 16: | Line 16: | ||
** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.  | ** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.  | ||
** Also related: perhaps add a second string up at teller top?  | ** Also related: perhaps add a second string up at teller top?  | ||
| − | + | * 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails.  Would be good to grab three for the Teller SW solar panel tripod  | |
===Utqiagvik===  | ===Utqiagvik===  | ||
* Intensive Site C HMP155 failed  | * Intensive Site C HMP155 failed  | ||
Revision as of 11:38, 11 June 2018
Seward Peninsula
- Replace broken precip bucket @ Teller Bottom
 - Replace broken precip bucket @ Koug m64
 - Replace Desiccant deal for radiometers
 - SR50A transducer replacement
 - Bring out additional desiccant?
 - Teller SW desiccant replacement
 - Data Download
 - Redrill hole for C1 Grid temperature probe
 - Teller Bottom Program Send
 - Measure Creek Flow
 - Re-level radiometers
 - Put out Divers for wells with Nathan
 - Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
 - Also related: perhaps add a second string up at teller top?
 
 - 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod
 
Utqiagvik
- Intensive Site C HMP155 failed