* 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails.  Would be good to grab three for the Teller SW solar panel tripod  | * 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails.  Would be good to grab three for the Teller SW solar panel tripod  | ||
* I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness.  | * I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness.  | ||
| + | |||
| + | ====Kougarok====  | ||
| + | * survey veg plots?  | ||
====Teller SW Flow====  | ====Teller SW Flow====  | ||
Revision as of 09:06, 28 August 2018
Contents
To Buy
- Step ladder for teller bottom
 - 12 volt Trimble cable
 
Seward Peninsula
- SR50A transducer replacement (fall activity)
 - bring out one step stool to level teller bottom radiometer.
 - bring out tap, die, drill, drill bit, screw for teller bottom radiometer.
- screw...
 
 - also replace cnr4 desiccant since the unit didn't look like it was sealing right with this missing screw.
 - Bring out additional desiccant? for box
 - Teller SW desiccant replacement
 - Redrill hole for C1 Grid temperature probe
- what is needed for this?
 
 - Measure Creek Flow
- salt slug, n=6 samples of 100g
 
 - Re-level radiometers
 - Measure thermistors resistances at Teller Bottom and add them to fieldbook.
- There are a couple with a 0.5C offset at spring freezing point so I think they may be failing and or something...
 - Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
 - Also related: perhaps add a second string up at teller top?
 - sort of some additional homework is that I saw instability in a number of thermistors when measuring up top. I suspect but haven't verified that this instability is an indicator for the wonky temperatures seen in the data but need to confirm.
 
 - 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod
 - I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness.
 
Kougarok
- survey veg plots?
 
Teller SW Flow
- cloth tape
- left a small cloth tape at the site
 
 - metal meter stick or folding tape
- left a metal meter stick at the site
 
 - flow tracker
 - fieldbook
 - YSI conductivity meter
- manual
 
 - electrical tape
 - We (Nathan and I) set up a reach to use for salt slug method discharge estimates.
 
Radiation Level:
- step ladder
 - a bit of wood to provide better base for step ladder
 - phillips screwdriver for level
 
Radiation Desiccant Swap:
- Step ladder
 - small CSI phillips
 - K&Z desiccant pack
 - anti-corrosion goo
 
Teller Top Soil Temperatures
- Volt meter
 - fieldbook
- learned but need to confirm that the thermistors with a capacitance are ones that are unstable and failing.
 
 
Utqiagvik
- Intensive Site C HMP155 failed
 - need to replace the network cable running from the computer to the network switch. It cuts out with minimal bumping.... but station is finally back online!!!
 - Site A SR50A transducers have failed
 - some subsurface items are beginning to fail.
 - bring up clear tape and a biz card to label the computer
 - bring up the nuc plate and wood screws and other screw packet to mount nuc to wall