Difference between revisions of "2018 NGEE Nome June Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
[[NGEE To Do Next Visit]]
 
[[NGEE To Do Next Visit]]
 
===Monday 6/11===
 
===Monday 6/11===
* Nathan W arrives
+
* Nathan W arrives, staying at Dredge
 +
** Reservation Confirmation Number: 479315
  
 
===Tuesday 6/12: Teller Day 1===
 
===Tuesday 6/12: Teller Day 1===
* Bob Busey arrives
+
* Bob Busey arrives, staying at Dredge
 +
** Reservation Confirmation Number: 964080
 
* head out to Teller
 
* head out to Teller
 
* download station data at bottom
 
* download station data at bottom
Line 34: Line 36:
 
* Put out divers for wells with Nathan
 
* Put out divers for wells with Nathan
 
* Stretch goal: download old UAF station data by radio at end of road
 
* Stretch goal: download old UAF station data by radio at end of road
 +
 +
===Friday 6/15: Loose ends===
 +
* Fly out Friday evening

Revision as of 11:07, 22 May 2018

NGEE To Do Next Visit

Monday 6/11

  • Nathan W arrives, staying at Dredge
    • Reservation Confirmation Number: 479315

Tuesday 6/12: Teller Day 1

  • Bob Busey arrives, staying at Dredge
    • Reservation Confirmation Number: 964080
  • head out to Teller
  • download station data at bottom
  • Teller Bottom Program Send
  • Replace broken precip bucket @ Teller Bottom
  • Replace Desiccant deal for Teller Bottom radiometer
  • Re-level radiometer & precip bucket
  • Teller SW desiccant replacement
  • Install Divers on bottom of hill sites
  • Data Download
  • Measure Flow in the Creek

Wednesday 6/13: Teller Day 2

  • Replace Desiccant deal for Teller Top radiometer
    • Bring out ladder
  • Re-level radiometer
  • Data Download @ Teller Top
  • Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
    • Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
    • Also related: perhaps add a second string up at teller top?
  • Finish deploying divers with Nathan

Thursday 6/14: Kougarok Day 1

  • Replace broken precip bucket @ Koug m64
  • Data Download
  • Replace Desiccant deal for radiometer
  • Re-level radiometer
  • Bring out additional desiccant?
  • Put out divers for wells with Nathan
  • Stretch goal: download old UAF station data by radio at end of road

Friday 6/15: Loose ends

  • Fly out Friday evening