Difference between revisions of "2018 NGEE Nome June Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
[[NGEE To Do Next Visit]]
 
[[NGEE To Do Next Visit]]
 +
===Trip Notes===
 +
====NGEE Koug m64====
 +
* Level precipitation bucket next visit
 +
* Need to bring ladder to reorient anemometer to south. Get offset from Nathan's fieldbook
 +
* Three more nails for guy wires the musk ox did a number on them
 +
* Might bring up a smaller diameter pipe x2 for inside radiation cross arm supports
 +
* Bring up drill and wood screws to secure tipping bucket to ground.
 +
* Definitely get bubble levels for every station
 +
====Teller====
 +
* Could use step stool for teller bottom radiometer (bring out next time)
 +
* One stripped out screw at teller bottom cnr4
 +
* Should leave bubble levels at each site for precipitation bucket slash radiometer
 +
* Should grab a couple extra low temp sd cards and just swap on visits for game cameras (have one spare at the moment)
 +
* Bring nails for teller sw. Three for winter configuration of solar panel.
 +
* Need to bring drill and tap/die to teller bottom
 +
 
===Monday 6/11===
 
===Monday 6/11===
 
* Nathan W arrives, staying at Dredge
 
* Nathan W arrives, staying at Dredge
Line 17: Line 33:
 
* Re-level radiometer & precip bucket
 
* Re-level radiometer & precip bucket
 
* Teller SW desiccant replacement
 
* Teller SW desiccant replacement
 +
* Teller SW: look at moving solar panel stand up to current station location
 
* Install Divers on bottom of hill sites
 
* Install Divers on bottom of hill sites
 
* Data Download
 
* Data Download
Line 22: Line 39:
 
** (I'm hoping LANL salt diffusion method here).
 
** (I'm hoping LANL salt diffusion method here).
 
** Flow intercomparison experiment.  We will measure several different ways.
 
** Flow intercomparison experiment.  We will measure several different ways.
 +
** Both Sontek FlowTracker and Sontek Professional Plus will be available from UAF. https://www.ysi.com/proplus
 +
====Day Pack Day 1====
 +
* tipping bucket
 +
* computer
 +
* 2x serial cable
 +
* SC32B interface box
 +
* tools
 +
** allen wrench for existing stand
 +
** 5/16" nut driver
 +
** phillips #2
 +
** CSI phillips
 +
** 1/2" wrench & nut driver
 +
** anti corrosion goo
 +
* desiccant for CNR4 & Teller SW PT
 +
* clothes
 +
* food
 +
** meat sticks
 +
** werthers
 +
** 2 bobo bars
 +
* fill water bottle
 +
* if nice gopro on gimble
 +
* hip waiders & sandals
 +
* rain coat
 +
* gaiters for hiking
 +
* volt meter
 +
* tool bag
 +
* purse
 +
* pepper spray
 +
* stereo
 +
* diet coke
 +
* sat phone
 +
* first aid kit
 +
* sat tracker
 +
* fieldbook
 +
* pencil
  
 
===Wednesday 6/13: Teller Day 2===
 
===Wednesday 6/13: Teller Day 2===
Line 45: Line 97:
 
===Friday 6/15: Loose ends===
 
===Friday 6/15: Loose ends===
 
* Fly out Friday evening
 
* Fly out Friday evening
 +
 +
===Things in UAF Storage to grab for trip===
 +
* Driving safety gear
 +
** tow rope
 +
** air pump
 +
** tire patch kit (though might buy another)
 +
** jumper cables
 +
* garbage bag for trash
 +
* pepper spray
 +
* wood for stepladder base at teller top?
 +
* '''tape measure for creek cross section'''
 +
* Teller Creek markers for discharge measurements:
 +
** 6 - 9 small rebar to outline: Salt deployment point, PT location, Salt Measurement point
 +
** pick up some colored electrical tape, too to mark these
 +
* tool bag for station work
 +
* Radio kit to catch up with UAF Kougarok sites.
 +
* bug dope etc
 +
*
  
 
===Anchorage Remaining Prep===
 
===Anchorage Remaining Prep===
 
* calibrate replacement tipping buckets
 
* calibrate replacement tipping buckets
 +
** Orifice Diameter = 24.5 cm
 +
** Orifice Area = 471.4 cm^2
 +
** 946 mL / Bottle
 +
** ~177 tips / bottle
 +
** 1mL = 1 cm^3
 +
 
* put box of gear together for trip
 
* put box of gear together for trip
 
* bring out a tape measure for creek stage
 
* bring out a tape measure for creek stage
 
* Finish looking at data.
 
* Finish looking at data.
 +
* folding tape for creek measurement (to stash at station)
 +
* Freshen up desiccant
 +
 +
===Potential Bonus Activities===
 +
* Multiple Discharge Measurements at Teller Creek
 +
*

Latest revision as of 10:09, 17 June 2018

NGEE To Do Next Visit

Trip Notes

NGEE Koug m64

  • Level precipitation bucket next visit
  • Need to bring ladder to reorient anemometer to south. Get offset from Nathan's fieldbook
  • Three more nails for guy wires the musk ox did a number on them
  • Might bring up a smaller diameter pipe x2 for inside radiation cross arm supports
  • Bring up drill and wood screws to secure tipping bucket to ground.
  • Definitely get bubble levels for every station

Teller

  • Could use step stool for teller bottom radiometer (bring out next time)
  • One stripped out screw at teller bottom cnr4
  • Should leave bubble levels at each site for precipitation bucket slash radiometer
  • Should grab a couple extra low temp sd cards and just swap on visits for game cameras (have one spare at the moment)
  • Bring nails for teller sw. Three for winter configuration of solar panel.
  • Need to bring drill and tap/die to teller bottom

Monday 6/11

  • Nathan W arrives, staying at Dredge
    • Reservation Confirmation Number: 479315

Tuesday 6/12: Teller Day 1

  • Bob Busey arrives
    • Flight: Alaska 151
    • Nome (OME) on Tue, Jun 12 at 7:49 am
  • Staying at Dredge
    • Reservation Confirmation Number: 964080
  • head out to Teller
  • download station data at bottom
  • Teller Bottom Program Send
  • Replace broken precip bucket @ Teller Bottom
  • Replace Desiccant deal for Teller Bottom radiometer
  • Re-level radiometer & precip bucket
  • Teller SW desiccant replacement
  • Teller SW: look at moving solar panel stand up to current station location
  • Install Divers on bottom of hill sites
  • Data Download
  • Measure Flow in the Creek
    • (I'm hoping LANL salt diffusion method here).
    • Flow intercomparison experiment. We will measure several different ways.
    • Both Sontek FlowTracker and Sontek Professional Plus will be available from UAF. https://www.ysi.com/proplus

Day Pack Day 1

  • tipping bucket
  • computer
  • 2x serial cable
  • SC32B interface box
  • tools
    • allen wrench for existing stand
    • 5/16" nut driver
    • phillips #2
    • CSI phillips
    • 1/2" wrench & nut driver
    • anti corrosion goo
  • desiccant for CNR4 & Teller SW PT
  • clothes
  • food
    • meat sticks
    • werthers
    • 2 bobo bars
  • fill water bottle
  • if nice gopro on gimble
  • hip waiders & sandals
  • rain coat
  • gaiters for hiking
  • volt meter
  • tool bag
  • purse
  • pepper spray
  • stereo
  • diet coke
  • sat phone
  • first aid kit
  • sat tracker
  • fieldbook
  • pencil

Wednesday 6/13: Teller Day 2

  • Replace Desiccant deal for Teller Top radiometer
    • Bring out ladder
  • Re-level radiometer
  • Data Download @ Teller Top
  • Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
    • Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
    • Also related: perhaps add a second string up at teller top?
  • Finish deploying divers with Nathan

Thursday 6/14: Kougarok Day 1

  • Replace broken precip bucket @ Koug m64
  • Data Download
  • Replace Desiccant deal for radiometer
  • Re-level radiometer
    • bring out two longer pipes to steady the radiomter pole
  • Bring out additional desiccant?
  • Put out divers for wells with Nathan
  • Stretch goal: download old UAF station data by radio at end of road

Friday 6/15: Loose ends

  • Fly out Friday evening

Things in UAF Storage to grab for trip

  • Driving safety gear
    • tow rope
    • air pump
    • tire patch kit (though might buy another)
    • jumper cables
  • garbage bag for trash
  • pepper spray
  • wood for stepladder base at teller top?
  • tape measure for creek cross section
  • Teller Creek markers for discharge measurements:
    • 6 - 9 small rebar to outline: Salt deployment point, PT location, Salt Measurement point
    • pick up some colored electrical tape, too to mark these
  • tool bag for station work
  • Radio kit to catch up with UAF Kougarok sites.
  • bug dope etc

Anchorage Remaining Prep

  • calibrate replacement tipping buckets
    • Orifice Diameter = 24.5 cm
    • Orifice Area = 471.4 cm^2
    • 946 mL / Bottle
    • ~177 tips / bottle
    • 1mL = 1 cm^3
  • put box of gear together for trip
  • bring out a tape measure for creek stage
  • Finish looking at data.
  • folding tape for creek measurement (to stash at station)
  • Freshen up desiccant

Potential Bonus Activities

  • Multiple Discharge Measurements at Teller Creek