Difference between revisions of "NGEE To Do Next Visit"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 8: | Line 8: | ||
* Dry Desiccant for Teller SW (I have a bottle for loose out there now plus the PT tubes  | * Dry Desiccant for Teller SW (I have a bottle for loose out there now plus the PT tubes  | ||
* Hardware inventory for Snow deployment  | * Hardware inventory for Snow deployment  | ||
| + | ** SR50A  | ||
| + | ** Mounting brackets  | ||
| + | ** Review sketch  | ||
* figure out the proper way to secure solar panels for snow  | * figure out the proper way to secure solar panels for snow  | ||
* think hard about improving solar panel setup at Teller m47.  | * think hard about improving solar panel setup at Teller m47.  | ||
| + | * Grab Survey controller and pelican case etc.  | ||
| + | * Charge batteries  | ||
| + | ====Teller 27 General====  | ||
| + | * Survey GCP  | ||
| + | * Help  | ||
====Teller Bottom To Do====  | ====Teller Bottom To Do====  | ||
* Secure tipping bucket    | * Secure tipping bucket    | ||
| Line 33: | Line 41: | ||
** solar panel  | ** solar panel  | ||
** cr800  | ** cr800  | ||
| + | ====Council====  | ||
| + | * Survey Sigrid / Margaret's sites  | ||
====NGEE Kougarok====  | ====NGEE Kougarok====  | ||
| + | * Survey GCP  | ||
| + | |||
===== Replace top mast and anemometer=====  | ===== Replace top mast and anemometer=====  | ||
* Full replacement anemometer  | * Full replacement anemometer  | ||
Revision as of 15:53, 14 July 2021
Contents
Sensor stats page
Current
2021 Content
Fairbanks To Do
- Dry desiccant for CNR4 (All four in Utqiagvik)
 - Dry Desiccant for Teller SW (I have a bottle for loose out there now plus the PT tubes
 - Hardware inventory for Snow deployment
- SR50A
 - Mounting brackets
 - Review sketch
 
 - figure out the proper way to secure solar panels for snow
 - think hard about improving solar panel setup at Teller m47.
 - Grab Survey controller and pelican case etc.
 - Charge batteries
 
Teller 27 General
- Survey GCP
 - Help
 
Teller Bottom To Do
- Secure tipping bucket
- bring out drill
 - bring out self tapping screws, 3x
 
 
Teller SW To Do
- Solar Panel Fixes (research in Fairbanks)
 - Deploy second PT
 - don't forget to grab more desiccant
 - Add a snow sensor here?
 
Teller m47
- Think hard about getting the solar panel off the ground a bit more
 - Install Tipping bucket
 - new  dry soil pit / dig up and replace original
- add soil moisture probes, too.
 
 - review what i proposed
- 4 soil moisture probes
 - air temp
 - second snow sensor
 - batteries
 - solar panel
 - cr800
 
 
Council
- Survey Sigrid / Margaret's sites
 
NGEE Kougarok
- Survey GCP
 
Replace top mast and anemometer
- Full replacement anemometer
- potentially could reuse one from storage but will need:
- propeller (need to order)
 - cable (fairbanks supplies)
 - right size cord grip (I'm sure this is found in my Fairbanks supplies... or the one that's currently broken... )
 - unistrut & 1" pipe & ubolts (try the square ones?)
 - nylock nuts
 
 
 - potentially could reuse one from storage but will need:
 - new brown tarp
 - Raspberry pi to download?
- memory card...
 
 - put soil moisture probe back in ground.
 - I guess remove VATP from program to make the data record last longer.
 
K1 Burn
- Should visit since I haven't heard from it.
 - change out the SR50A transducer
 - bring a thermistor for air temp (assuming there will be some damages)
 - I guess, given that it isn't on the radio network any more I should expect something worse.
- power cable to fix a chewed solar panel
 - coax in case that was chewed
 
 
K2 Met
- Station visit required
 - Bring out desiccant for radiometers (loose)
 - replace CR10X but change the watch battery on the logger to take out first.
 
K3 Mauze Gulch
- No idea... need to review how I left things in 2019.
 
Things to Order
Related: Need to separate out by project ID
- Campbell Scientific
- RM Young anemometer propellers ( $70 at RM Young website) https://www.youngusa.com ; p/n 08214-45)
 - Texas Electronics Tipping Bucket
- cobble from parts?
 
 - SR50A transducers
- new deployment
 - existing @ Utqiagvik = 8 = 2A + 2B + 3C + 1D
 - existing @ SP = 10 = 4 (K1 to K3 + ngee m64) + 1 m47 + 4 m27 + 1 council?
 
 - 2.5 psi for Teller SW
 
 
Older:
To Buy
- Step ladder for teller bottom
 - Bring out a replacement memory card for the Teller Bottom CFM module
 
General
- 2 Trimble Yellow batteries left in NW Campus Warm Storage
 
Seward Peninsula
- SR50A transducer replacement (fall activity)
 - (2019) bring out one step stool to level teller bottom radiometer.
 - (2019) bring out tap, die, drill, drill bit, screw for teller bottom radiometer.
- screw...
 
 - also replace cnr4 desiccant since the unit didn't look like it was sealing right with this missing screw.
 - Bring out additional desiccant? for box
 - Teller SW desiccant replacement
 - (2019) Redrill hole for C1 Grid temperature probe
- what is needed for this?
 
 - Measure Creek Flow
- salt slug, n=2 samples of 50g / known volume of water
 
 - Re-level radiometers
 - polish radiometer domes
 - Measure thermistors resistances at Teller Bottom and add them to fieldbook.
- There are a couple with a 0.5C offset at spring freezing point so I think they may be failing and or something...
 - Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
 - Also related: perhaps add a second string up at teller top?
 - sort of some additional homework is that I saw instability in a number of thermistors when measuring up top. I suspect but haven't verified that this instability is an indicator for the wonky temperatures seen in the data but need to confirm.
 
 - 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod
 - I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness.
 - finish surveying vegetation plots
 
Kougarok
- bring out a serial cable for box (removed it in fall 2018)
 - get a compass reading on anemometer
- leave a compass in the box
 
 
Teller SW Flow
- left a metal meter stick at the site
 - fieldbook
 - YSI conductivity meter
- manual
 
 - electrical tape
 - batteries
 
Radiation Level:
- step ladder
 - a bit of wood to provide better base for step ladder
 - phillips screwdriver for level
 
Radiation Desiccant Swap:
- Step ladder
 - small CSI phillips
 - K&Z desiccant pack
 - anti-corrosion goo
 
Teller Top Soil Temperatures
- Volt meter
 - fieldbook
- learned but need to confirm that the thermistors with a capacitance are ones that are unstable and failing.
 
 
Utqiagvik
- Intensive Site A HMP155 failed (3.5m)
 - Intensive Site B HMP155 failed (1.4m)
 - Intensive Site C HMP155 failed
 - need to replace the network cable running from the computer to the network switch. It cuts out with minimal bumping.... but station is finally back online!!!
 - Site A SR50A transducers have failed
 - some subsurface items are beginning to fail.
 - bring up clear tape and a biz card to label the computer
 - bring up the nuc plate and wood screws and other screw packet to mount nuc to wall