| Line 1: | Line 1: | ||
==Sep field work 2012==  | ==Sep field work 2012==  | ||
* Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.  | * Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.  | ||
| − | *   | + | * Arrive on the evening on Monday Sep 24.  | 
| − | * People: Bob   | + | * People: Bob B, Anna L, Sasha K  | 
==Itinerary==  | ==Itinerary==  | ||
| + | ===Tasks===  | ||
| + | * download and maintain Campbell logger  | ||
| + | ** change program to make it table data compatible  | ||
| + | ** load new OS  | ||
| + | ** set pakbus ID to 404  | ||
| + | * Installation of additional CSI snow depth (4)  | ||
| + | ** need to add an extra sensor to one of the sites  | ||
| + | ** I have the sensors, A & S have the rest of the parts  | ||
| + | * move webcam 90 degrees:  | ||
| + | ** short unistrut pieces (need to cut from stock in prep room)  | ||
| + | ** four bolts  | ||
| + | ** two angle pieces (four hole)  | ||
| + | ** four strut nuts  | ||
| + | ** sawzall packed  | ||
| + | ** climbing harness  | ||
| + | * set up base radio & usb to serial  | ||
| + | ** bring a few components from Fairbanks  | ||
| + | **   | ||
| − | + | Oh, I was thinking for the base radio to bring the sawzall, cut the rusted ubolts on the tower and then hose clamp a new pipe in place for the base antenna  | |
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | + | From my field book:  | |
| − | *   | + | * Seal 3" Pipes  | 
| − | **   | + | * serial cable to C (bring from FAI)  | 
| − | **   | + | * null modem to A (at the control shed)  | 
| − | *  | + | * animal proof A  | 
| − | *  | + | * tarps to B & C  | 
| − | + | * NRS to C  | |
| − | + | * mount antenna and set up rad network  | |
| − | + | * TC probes @ C need extending  | |
| − | *  | + | * Need to get #5  thermal conductivity S/N at C (maybe hold off till I wire them in?)  | 
| − | + | * Need to look at what a good value for heat flux looks like prior to the trip  | |
| − | |||
| − | |||
| − | |||
Latest revision as of 18:00, 20 September 2012
Sep field work 2012
- Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.
 - Arrive on the evening on Monday Sep 24.
 - People: Bob B, Anna L, Sasha K
 
Itinerary
Tasks
- download and maintain Campbell logger
- change program to make it table data compatible
 - load new OS
 - set pakbus ID to 404
 
 - Installation of additional CSI snow depth (4)
- need to add an extra sensor to one of the sites
 - I have the sensors, A & S have the rest of the parts
 
 - move webcam 90 degrees:
- short unistrut pieces (need to cut from stock in prep room)
 - four bolts
 - two angle pieces (four hole)
 - four strut nuts
 - sawzall packed
 - climbing harness
 
 - set up base radio & usb to serial
- bring a few components from Fairbanks
 
 
Oh, I was thinking for the base radio to bring the sawzall, cut the rusted ubolts on the tower and then hose clamp a new pipe in place for the base antenna
From my field book:
- Seal 3" Pipes
 - serial cable to C (bring from FAI)
 - null modem to A (at the control shed)
 - animal proof A
 - tarps to B & C
 - NRS to C
 - mount antenna and set up rad network
 - TC probes @ C need extending
 - Need to get #5 thermal conductivity S/N at C (maybe hold off till I wire them in?)
 - Need to look at what a good value for heat flux looks like prior to the trip
 
Potential Extra Items
- Install power from Control Shed to site C (I am not sure the power is available to us??)
 - Install wireless communication to grid site (requires power)