+ | ==Post Trip Notes== | ||
+ | ===Teller Bottom=== | ||
+ | * Deployed CNR4 s/n 120966 | ||
+ | ** SW Upper 14.05 | ||
+ | ** SW Lower 13.42 | ||
+ | ** LW Upper 12.47 | ||
+ | ** LW Lower 13.33 | ||
+ | * Used dog anchor to secure tipping bucket to ground | ||
+ | * tried to download the missing files but they errored. | ||
+ | * sent new program with fixed coefficients. | ||
+ | * removed game camera | ||
+ | ===Teller SW=== | ||
+ | * downloaded data | ||
+ | * I think determined that the trannsducer needs replacing for the snow sensor | ||
+ | ** Need ladder. (used sw actionpacker to provide a flat surface high up and then made several manual measurements to determine sensor is kaput. Still communicating fine just returning 0 values. | ||
+ | * discharge measurement | ||
+ | |||
+ | ===TL IS2=== | ||
+ | ====Mid Trip Notes==== | ||
+ | * Need to bring out 1/2" wrench | ||
+ | * Need to grab SR50A sensor cable | ||
+ | * Need to bring out from conex an interface box | ||
+ | * Need to return with drill and saw | ||
+ | * probably need to drill a new hole at the station (possibly) | ||
+ | * probably need saw again | ||
+ | * probably need sledge again | ||
+ | * replaced data logger and charge controller | ||
+ | ** charger looked to be functioning. | ||
+ | * got good signal from high willow sensor | ||
+ | * meadow sensor wires pulled from the sensor when it fell over. need to replace cable and interface box | ||
+ | * was going to completely remove the snow sensor at the. base but I think I can get it back and going again, too. W | ||
+ | * should bring out guy wire supplies again. | ||
+ | |||
+ | |||
+ | ==Pre Trip Data Review== | ||
+ | * KG IS5 Snow: WS/AT good | ||
+ | ** | ||
+ | * KG Trans9 Snow: WS/AT good | ||
+ | * KG m64 Met: | ||
+ | ** Swap Barometric Pressure and fix the vent tube. | ||
+ | * Teller Bottom | ||
+ | ** Data download: regrab file 165.dat series. (5/22 to 6/5) | ||
+ | * Teller SW | ||
+ | ** Data all good but refresh desiccant | ||
+ | ** Take a minute to sort out if the 0 values in the snow sensor time series are from the bushes interfering with the signal before replacing sensor. | ||
+ | * Teller Top | ||
+ | ** Not visited since March... | ||
+ | * Teller m47 | ||
+ | ** | ||
==Items for October Trip== | ==Items for October Trip== | ||
+ | ===In Anchorage general supply=== | ||
+ | * SC932? | ||
+ | * Radio? (plan B could be use the radio for calling kougarok sites) | ||
+ | * | ||
+ | ===In UAF connex=== | ||
+ | * Sledge hammer for snow stand anchors | ||
+ | * pipe wrench for snow stand achor removal (if necessary) | ||
+ | * ladder | ||
+ | * car safety kit | ||
+ | * extra fuel (for later in trip) | ||
+ | * bear spray | ||
+ | * foot driers | ||
+ | * spare cabling for Teller Top | ||
+ | * Replacement pressure sensor for Kougarok hill | ||
+ | * 2 spare HMP155s | ||
+ | * 2 CNR4s for Teller top & bottom | ||
+ | * cable protection for Teller IS2 | ||
+ | * cable protection for Kougarok Trans9 | ||
+ | * Spare SR50A for Teller IS2 meadow / Teller m47 willows | ||
+ | |||
+ | ===Things to grab in Fairbanks yet=== | ||
+ | * @ room 106 a charge controller for IS2 snow site | ||
+ | * @ room 207B: Pressure transducer 2 desiccant holder. | ||
+ | * @ room 207B: SC932A? | ||
+ | * @ Cabin: Another anchor or two / wire rope for snow stands year 2 | ||
+ | * XX CR1000 for Teller IS2 Snow | ||
+ | * XX Drill | ||
+ | * XX Sawzall | ||
+ | * flat plate of some sort for under IS2 bases (optionally: trail mat?) | ||
+ | |||
+ | ===To Buy yet=== | ||
+ | * Mineral / Baby Oil | ||
+ | * Ford Funnel | ||
+ | * Pruning shears | ||
+ | * 2 Dog anchors for Teller IS2 Meadow | ||
+ | * 3/16" cable clamps | ||
+ | * another short step stool / ladder | ||
+ | * TL-IS2 [[Snow Depth Stand]] 10ft pipe | ||
+ | ** 3/4 in x 10 ft pipe | ||
+ | ** 3/4" Box wrench | ||
+ | ** 1/4" Allen Wrench | ||
+ | * XX machine screws (looks up size from the tap & die I have... also maybe buy a couple more bits) (for cnr4 radiometers) | ||
+ | * Battery box lid rope / twine / nrs strap. | ||
+ | * For the snow sites: | ||
+ | ** Guy wire | ||
+ | ** cable clamps | ||
+ | ** screed stake / dog anchor | ||
+ | * ngee m64: the pvc pipe to use for keeping pressure sensor accurate over the winter | ||
===Nome Conex Instrument Inventory (May 2022 Edition)=== | ===Nome Conex Instrument Inventory (May 2022 Edition)=== | ||
Line 29: | Line 126: | ||
===Teller 47 Snow=== | ===Teller 47 Snow=== | ||
* Vertical pipe bent a bit over the winter. | * Vertical pipe bent a bit over the winter. | ||
− | + | * If available, use spare SR50A here | |
+ | * need to take down station so might need ladder (we've brought up in past) | ||
+ | ** pipe wrench | ||
+ | ** sledge hammer | ||
+ | * | ||
===Teller Top=== | ===Teller Top=== | ||
− | * | + | ====Tasks==== |
− | ** might also try leaving sensor turned on for longer in program (a to do for when CNR4 returns recalibrated) | + | * Bring up HMP155 cable from nome conex and replace cable |
+ | * Need rubber splicing tape | ||
+ | * electrical tape | ||
+ | * Recalibrated CNR4 from conex | ||
+ | * might also try leaving sensor turned on for longer in program (a to do for when CNR4 returns recalibrated) | ||
** Musk Ox within 50 meters of station prevented a visit. | ** Musk Ox within 50 meters of station prevented a visit. | ||
+ | * SR50A transducer replacement | ||
+ | |||
+ | ===Anvil=== | ||
+ | * Look at replacing radio / SC932A | ||
===Snow Stand Improvements=== | ===Snow Stand Improvements=== | ||
Line 44: | Line 153: | ||
** Teller 47 snow | ** Teller 47 snow | ||
** KG-IS5 Snow 2x | ** KG-IS5 Snow 2x | ||
− | |||
==Proposed Itinerary== | ==Proposed Itinerary== | ||
− | ===Day 1 === | + | ===Day 1 Sunday === |
* Arrive on evening flight | * Arrive on evening flight | ||
* Pick up Truck. | * Pick up Truck. | ||
* Grocery for perishables and local snacks | * Grocery for perishables and local snacks | ||
− | * Swing through campus and look at the radio base station antenna | + | * XX Swing through campus and look at the radio base station antenna |
+ | ** Should get access to the building to look at it indoors this trip though... | ||
* if weather cooperative / time allows visit anvil otherwise squeeze in early in trip. | * if weather cooperative / time allows visit anvil otherwise squeeze in early in trip. | ||
Line 60: | Line 169: | ||
** Replace radiometer at Teller Bottom | ** Replace radiometer at Teller Bottom | ||
** Replace snow transducers on reachable systems | ** Replace snow transducers on reachable systems | ||
− | ** | + | ** Fix Tipping bucket |
** Teller Bottom Soil Moisture sensor need a bit of attention. No SDI 12 action. | ** Teller Bottom Soil Moisture sensor need a bit of attention. No SDI 12 action. | ||
− | ** | + | ** Bring out step ladder for Teller Bottom CNR4 |
** Teller IS2 charge controller doesn't look to be working (confirmed looking at March data download). | ** Teller IS2 charge controller doesn't look to be working (confirmed looking at March data download). | ||
** Teller sw could use one serial cable | ** Teller sw could use one serial cable | ||
Line 90: | Line 199: | ||
===Day 5=== | ===Day 5=== | ||
+ | * Leftovers at teller bottom area | ||
+ | |||
+ | |||
+ | ====Out of date:==== | ||
* Council | * Council | ||
** download data at grid and level tipping bucket | ** download data at grid and level tipping bucket | ||
Line 95: | Line 208: | ||
*** check battery voltage in 21/22 winter. | *** check battery voltage in 21/22 winter. | ||
* Visit Skookum and check out antenna / radio | * Visit Skookum and check out antenna / radio | ||
+ | |||
===Day 6=== | ===Day 6=== | ||
* | * | ||
* Wrap up loose ends in town | * Wrap up loose ends in town | ||
* Return home on morning flight | * Return home on morning flight |
Latest revision as of 17:42, 3 October 2022
Contents
- 1 Post Trip Notes
- 2 Pre Trip Data Review
- 3 Items for October Trip
- 3.1 In Anchorage general supply
- 3.2 In UAF connex
- 3.3 Things to grab in Fairbanks yet
- 3.4 To Buy yet
- 3.5 Nome Conex Instrument Inventory (May 2022 Edition)
- 3.6 Older Note to follow up on: Teller bottom 2022-05-20
- 3.7 Teller IS2 Snow
- 3.8 Teller 47
- 3.9 Teller 47 Snow
- 3.10 Teller Top
- 3.11 Anvil
- 3.12 Snow Stand Improvements
- 4 Proposed Itinerary
Post Trip Notes
Teller Bottom
- Deployed CNR4 s/n 120966
- SW Upper 14.05
- SW Lower 13.42
- LW Upper 12.47
- LW Lower 13.33
- Used dog anchor to secure tipping bucket to ground
- tried to download the missing files but they errored.
- sent new program with fixed coefficients.
- removed game camera
Teller SW
- downloaded data
- I think determined that the trannsducer needs replacing for the snow sensor
- Need ladder. (used sw actionpacker to provide a flat surface high up and then made several manual measurements to determine sensor is kaput. Still communicating fine just returning 0 values.
- discharge measurement
TL IS2
Mid Trip Notes
- Need to bring out 1/2" wrench
- Need to grab SR50A sensor cable
- Need to bring out from conex an interface box
- Need to return with drill and saw
- probably need to drill a new hole at the station (possibly)
- probably need saw again
- probably need sledge again
- replaced data logger and charge controller
- charger looked to be functioning.
- got good signal from high willow sensor
- meadow sensor wires pulled from the sensor when it fell over. need to replace cable and interface box
- was going to completely remove the snow sensor at the. base but I think I can get it back and going again, too. W
- should bring out guy wire supplies again.
Pre Trip Data Review
- KG IS5 Snow: WS/AT good
- KG Trans9 Snow: WS/AT good
- KG m64 Met:
- Swap Barometric Pressure and fix the vent tube.
- Teller Bottom
- Data download: regrab file 165.dat series. (5/22 to 6/5)
- Teller SW
- Data all good but refresh desiccant
- Take a minute to sort out if the 0 values in the snow sensor time series are from the bushes interfering with the signal before replacing sensor.
- Teller Top
- Not visited since March...
- Teller m47
Items for October Trip
In Anchorage general supply
- SC932?
- Radio? (plan B could be use the radio for calling kougarok sites)
In UAF connex
- Sledge hammer for snow stand anchors
- pipe wrench for snow stand achor removal (if necessary)
- ladder
- car safety kit
- extra fuel (for later in trip)
- bear spray
- foot driers
- spare cabling for Teller Top
- Replacement pressure sensor for Kougarok hill
- 2 spare HMP155s
- 2 CNR4s for Teller top & bottom
- cable protection for Teller IS2
- cable protection for Kougarok Trans9
- Spare SR50A for Teller IS2 meadow / Teller m47 willows
Things to grab in Fairbanks yet
- @ room 106 a charge controller for IS2 snow site
- @ room 207B: Pressure transducer 2 desiccant holder.
- @ room 207B: SC932A?
- @ Cabin: Another anchor or two / wire rope for snow stands year 2
- XX CR1000 for Teller IS2 Snow
- XX Drill
- XX Sawzall
- flat plate of some sort for under IS2 bases (optionally: trail mat?)
To Buy yet
- Mineral / Baby Oil
- Ford Funnel
- Pruning shears
- 2 Dog anchors for Teller IS2 Meadow
- 3/16" cable clamps
- another short step stool / ladder
- TL-IS2 Snow Depth Stand 10ft pipe
- 3/4 in x 10 ft pipe
- 3/4" Box wrench
- 1/4" Allen Wrench
- XX machine screws (looks up size from the tap & die I have... also maybe buy a couple more bits) (for cnr4 radiometers)
- Battery box lid rope / twine / nrs strap.
- For the snow sites:
- Guy wire
- cable clamps
- screed stake / dog anchor
- ngee m64: the pvc pipe to use for keeping pressure sensor accurate over the winter
Nome Conex Instrument Inventory (May 2022 Edition)
- Left 2 HMP155s in Nome Conex
- Left 1 SR50A in Nome Conex
- Left 1 BP Sensor in Nome Conex
- Left 2 anemometers in Nome Conext
Older Note to follow up on: Teller bottom 2022-05-20
- Problem files
- Micromet110.dat
- Mm112
Teller IS2 Snow
- Need a base plate for 4x4 to keep it from sinking further into muck. That turns out to be the source/reason for the lean.
- Limited Lean 5/22/22 by pounding in rebar with guy wire anchor. Could use rebar cap from storage for it (or from Fairbanks)
- Also on 5/22/22: Verified voltage of solar panel and battery. Charge controller needs replacement
Teller 47
- Guy wire off again creek side
- Baud rate on md485 set to 9600. I always forget so might need to adjust serial port speed before collecting here
- Should really buy a couple of the rs232 cables for the cr6 cas sites
- Should look at pressure data here and compare to teller bottom.
- There are flies in the vent and it should be replaced
- I think we have a baby oil in conex for fall 2022 geonor.
Teller 47 Snow
- Vertical pipe bent a bit over the winter.
- If available, use spare SR50A here
- need to take down station so might need ladder (we've brought up in past)
- pipe wrench
- sledge hammer
Teller Top
Tasks
- Bring up HMP155 cable from nome conex and replace cable
- Need rubber splicing tape
- electrical tape
- Recalibrated CNR4 from conex
- might also try leaving sensor turned on for longer in program (a to do for when CNR4 returns recalibrated)
- Musk Ox within 50 meters of station prevented a visit.
- SR50A transducer replacement
Anvil
- Look at replacing radio / SC932A
Snow Stand Improvements
- Shipped out in March parts to add a snow depth side diagonal support (just need to buy the pipe).
- Teller 47 snow
- KG-IS5 snow
- Teller IS2 2x
- Should also add back side guy wires to:
- Teller IS2 2x
- Teller 47 snow
- KG-IS5 Snow 2x
Proposed Itinerary
Day 1 Sunday
- Arrive on evening flight
- Pick up Truck.
- Grocery for perishables and local snacks
- XX Swing through campus and look at the radio base station antenna
- Should get access to the building to look at it indoors this trip though...
- if weather cooperative / time allows visit anvil otherwise squeeze in early in trip.
Day 2
- Drive to Teller 27
- Gage the Creek
- Download data from all sites at bottom
- Replace radiometer at Teller Bottom
- Replace snow transducers on reachable systems
- Fix Tipping bucket
- Teller Bottom Soil Moisture sensor need a bit of attention. No SDI 12 action.
- Bring out step ladder for Teller Bottom CNR4
- Teller IS2 charge controller doesn't look to be working (confirmed looking at March data download).
- Teller sw could use one serial cable
Day 3
- Visit Kougarok sites
- Replace pressure sensor at met station
- m64 met: relevel cnr4 & tipping bucket
- Snipped the pressure vent tube but thinking I should return with something more. Like pvc pipe going to ground so there is even less chance of clogging. Like could add the T sections of drill holes in pipe for venting
- Kg is5 snow
- Replace battery box lid
- Could use a sticky hook to hold serial cables up inside these boxes
- KG South Transect Snow
- All good here nothing to change.
Day 4
- Drive to Teller 47 site
- download data
- dump precip bucket
- need baby oil
- level radiometer
- (ordered a replacement SR50A for the willows site. Will need to deploy this trip)
- Drive to teller top
- download data
- HMP155 cable, try redoing the connections inside the instrument box.
- replace CNR4
Day 5
- Leftovers at teller bottom area
Out of date:
- Council
- download data at grid and level tipping bucket
- disconnect radio?
- check battery voltage in 21/22 winter.
- Visit Skookum and check out antenna / radio
Day 6
- Wrap up loose ends in town
- Return home on morning flight