2022 NGEE Nome October Trip
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
		
		
		
		
		
		
	
Contents
- 1 Post Trip Notes
 - 2 Pre Trip Data Review
 - 3 Items for October Trip
- 3.1 In Anchorage general supply
 - 3.2 In UAF connex
 - 3.3 Things to grab in Fairbanks yet
 - 3.4 To Buy yet
 - 3.5 Nome Conex Instrument Inventory (May 2022 Edition)
 - 3.6 Older Note to follow up on: Teller bottom 2022-05-20
 - 3.7 Teller IS2 Snow
 - 3.8 Teller 47
 - 3.9 Teller 47 Snow
 - 3.10 Teller Top
 - 3.11 Anvil
 - 3.12 Snow Stand Improvements
 
 - 4 Proposed Itinerary
 
Post Trip Notes
Teller Bottom
- Deployed CNR4 s/n 120966
- SW Upper 14.05
 - SW Lower 13.42
 - LW Upper 12.47
 - LW Lower 13.33
 
 - Used dog anchor to secure tipping bucket to ground
 - tried to download the missing files but they errored.
 - sent new program with fixed coefficients.
 - removed game camera
 
Teller SW
- downloaded data
 - I think determined that the trannsducer needs replacing for the snow sensor
- Need ladder. (used sw actionpacker to provide a flat surface high up and then made several manual measurements to determine sensor is kaput. Still communicating fine just returning 0 values.
 
 - discharge measurement
 
TL IS2
Mid Trip Notes
- Need to bring out 1/2" wrench
 - Need to grab SR50A sensor cable
 - Need to bring out from conex an interface box
 - Need to return with drill and saw
 - probably need to drill a new hole at the station (possibly)
 - probably need saw again
 - probably need sledge again
 - replaced data logger and charge controller
- charger looked to be functioning.
 
 - got good signal from high willow sensor
 - meadow sensor wires pulled from the sensor when it fell over. need to replace cable and interface box
 - was going to completely remove the snow sensor at the. base but I think I can get it back and going again, too. W
 - should bring out guy wire supplies again.
 
Pre Trip Data Review
- KG IS5 Snow: WS/AT good
 - KG Trans9 Snow: WS/AT good
 - KG m64 Met:
- Swap Barometric Pressure and fix the vent tube.
 
 - Teller Bottom
- Data download: regrab file 165.dat series. (5/22 to 6/5)
 
 - Teller SW
- Data all good but refresh desiccant
 - Take a minute to sort out if the 0 values in the snow sensor time series are from the bushes interfering with the signal before replacing sensor.
 
 - Teller Top
- Not visited since March...
 
 - Teller m47
 
Items for October Trip
In Anchorage general supply
- SC932?
 - Radio? (plan B could be use the radio for calling kougarok sites)
 
In UAF connex
- Sledge hammer for snow stand anchors
 - pipe wrench for snow stand achor removal (if necessary)
 - ladder
 - car safety kit
 - extra fuel (for later in trip)
 - bear spray
 - foot driers
 - spare cabling for Teller Top
 - Replacement pressure sensor for Kougarok hill
 - 2 spare HMP155s
 - 2 CNR4s for Teller top & bottom
 - cable protection for Teller IS2
 - cable protection for Kougarok Trans9
 - Spare SR50A for Teller IS2 meadow / Teller m47 willows
 
Things to grab in Fairbanks yet
- @ room 106 a charge controller for IS2 snow site
 - @ room 207B: Pressure transducer 2 desiccant holder.
 - @ room 207B: SC932A?
 - @ Cabin: Another anchor or two / wire rope for snow stands year 2
 - XX CR1000 for Teller IS2 Snow
 - XX Drill
 - XX Sawzall
 - flat plate of some sort for under IS2 bases (optionally: trail mat?)
 
To Buy yet
- Mineral / Baby Oil
 - Ford Funnel
 - Pruning shears
 - 2 Dog anchors for Teller IS2 Meadow
 - 3/16" cable clamps
 - another short step stool / ladder
 - TL-IS2 Snow Depth Stand 10ft pipe
- 3/4 in x 10 ft pipe
 - 3/4" Box wrench
 - 1/4" Allen Wrench
 
 - XX machine screws (looks up size from the tap & die I have... also maybe buy a couple more bits) (for cnr4 radiometers)
 - Battery box lid rope / twine / nrs strap.
 - For the snow sites:
- Guy wire
 - cable clamps
 - screed stake / dog anchor
 
 - ngee m64: the pvc pipe to use for keeping pressure sensor accurate over the winter
 
Nome Conex Instrument Inventory (May 2022 Edition)
- Left 2 HMP155s in Nome Conex
 - Left 1 SR50A in Nome Conex
 - Left 1 BP Sensor in Nome Conex
 - Left 2 anemometers in Nome Conext
 
Older Note to follow up on: Teller bottom 2022-05-20
- Problem files
- Micromet110.dat
 - Mm112
 
 
Teller IS2 Snow
- Need a base plate for 4x4 to keep it from sinking further into muck. That turns out to be the source/reason for the lean.
 - Limited Lean 5/22/22 by pounding in rebar with guy wire anchor. Could use rebar cap from storage for it (or from Fairbanks)
 - Also on 5/22/22: Verified voltage of solar panel and battery. Charge controller needs replacement
 
Teller 47
- Guy wire off again creek side
 - Baud rate on md485 set to 9600. I always forget so might need to adjust serial port speed before collecting here
- Should really buy a couple of the rs232 cables for the cr6 cas sites
 
 - Should look at pressure data here and compare to teller bottom.
 - There are flies in the vent and it should be replaced
 - I think we have a baby oil in conex for fall 2022 geonor.
 
Teller 47 Snow
- Vertical pipe bent a bit over the winter.
 - If available, use spare SR50A here
 - need to take down station so might need ladder (we've brought up in past)
- pipe wrench
 - sledge hammer
 
 
Teller Top
Tasks
- Bring up HMP155 cable from nome conex and replace cable
 - Need rubber splicing tape
 - electrical tape
 - Recalibrated CNR4 from conex
 - might also try leaving sensor turned on for longer in program (a to do for when CNR4 returns recalibrated)
- Musk Ox within 50 meters of station prevented a visit.
 
 - SR50A transducer replacement
 
Anvil
- Look at replacing radio / SC932A
 
Snow Stand Improvements
- Shipped out in March parts to add a snow depth side diagonal support (just need to buy the pipe).
- Teller 47 snow
 - KG-IS5 snow
 - Teller IS2 2x
 
 - Should also add back side guy wires to:
- Teller IS2 2x
 - Teller 47 snow
 - KG-IS5 Snow 2x
 
 
Proposed Itinerary
Day 1 Sunday
- Arrive on evening flight
 - Pick up Truck.
 - Grocery for perishables and local snacks
 - XX Swing through campus and look at the radio base station antenna
- Should get access to the building to look at it indoors this trip though...
 
 - if weather cooperative / time allows visit anvil otherwise squeeze in early in trip.
 
Day 2
- Drive to Teller 27
- Gage the Creek
 - Download data from all sites at bottom
 - Replace radiometer at Teller Bottom
 - Replace snow transducers on reachable systems
 - Fix Tipping bucket
 - Teller Bottom Soil Moisture sensor need a bit of attention. No SDI 12 action.
 - Bring out step ladder for Teller Bottom CNR4
 - Teller IS2 charge controller doesn't look to be working (confirmed looking at March data download).
 - Teller sw could use one serial cable
 
 
Day 3
- Visit Kougarok sites
 - Replace pressure sensor at met station
 - m64 met: relevel cnr4 & tipping bucket
 - Snipped the pressure vent tube but thinking I should return with something more. Like pvc pipe going to ground so there is even less chance of clogging. Like could add the T sections of drill holes in pipe for venting
 - Kg is5 snow
- Replace battery box lid
 - Could use a sticky hook to hold serial cables up inside these boxes
 
 - KG South Transect Snow
- All good here nothing to change.
 
 
Day 4
- Drive to Teller 47 site
- download data
 - dump precip bucket
- need baby oil
 
 - level radiometer
 - (ordered a replacement SR50A for the willows site. Will need to deploy this trip)
 
 - Drive to teller top
- download data
 - HMP155 cable, try redoing the connections inside the instrument box.
 - replace CNR4
 
 
Day 5
- Leftovers at teller bottom area
 
Out of date:
- Council
- download data at grid and level tipping bucket
 - disconnect radio?
- check battery voltage in 21/22 winter.
 
 
 - Visit Skookum and check out antenna / radio
 
Day 6
- Wrap up loose ends in town
 - Return home on morning flight