This is a to do list  detailing work to be done on the Sept 2-13 field trip.  
 
This is a to do list  detailing work to be done on the Sept 2-13 field trip.  
Stream Team (Ken, Emily, Horacio/Bill, Rob) Sept 2-9 or so working out of Prudhoe first, then moving to Toolik.
+
Stream Team (Ken, Emily, Horacio/Bill, Jeff Derry, Bill Lee ) Sept 2-8 or so working out of Prudhoe first, then moving to Toolik.
 
Met Team (Mike L., Jeff D., 3rd person) Sept 9-13 or so working out of Toolik.
 
Met Team (Mike L., Jeff D., 3rd person) Sept 9-13 or so working out of Toolik.
  
Remember to make reservations at Toolik (& bring your own sleeping bag/sheets/blankets/pillow)
+
== Reminders ==
 +
*Remember to make reservations at Toolik (& bring your own sleeping bag/sheets/blankets/pillow)
 +
*Remember to get rooms in Deadhorse. 
  
'''Note:''' Sites are grouped by area.
+
== Field Notes ==
 +
* Bring additional fenceposts/e-fence wire/hardware
 +
* Bring SR50 transducer for replacements (change out at all stations on Coastal Plain)
 +
* Remove Bullen/Foothills net rad sensors for recalibration (every two years)
 +
* Bring spare rain grates (US and metric).  Check all rain gauges and record in notes whether US or metric gauge.
 +
* Bring a bunch of black campbell SC12 2 peripheral cables (or whatever they are) to leave at new stations/repeaters, they were missing at Itikmalakpak & May Creek.
 +
* Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)
 +
* Apparently some of the tilt down tripods were installed so that they could not be tilted down due to the solar panel being in the way.  If time permits, this could be fixed, we use this feature often.
 +
* Note that the program file names are TOO LONG making it impossible to figure out which program is running and impossible to select the correct program to edit.  Ken please fix this and the other problems in the programs so we can reload via radio them right before the fall trip (and notice if there are other problems, then at least we can fix during the site visit).
 +
* Bark chips should be added where needed.  We should have some up at Toolik but I didn't notice them on the last trip (but I wasn't looking).
 +
* Load updated firmware to datalogger (v. 17)
  
== Day 0, Drive to Deadhorse ==
 
  
 +
== Day 0, Drive to Deadhorse (Sept 1/2) -- UAF ==
 +
*Emily/Bill Lee drives to Toolik Sept 1 and then to Deadhorse Sept 2 w/ Ken
 +
*Jeff D. flies to Prudhoe Sept 2
 +
*Bill S. flies to Prudhoe Sept 3
 +
*Horacio arrives Sept 4/5, Bill departs Sept 5
 +
*Bill L. departs on Sept 6 if no GPS survey needed at Umiat river stations
 +
*Horacio departs Toolik Sept 7 for Prudhoe or Fairbanks
  
== Day 1 & 2 Shaviovik, U1, Kadleroshilik River helicopter sites==
+
== Day 1, 2, 3 (Sept 3-5) Shaviovik, U1, Kadleroshilik River, Bullen DBM8, Lower Kad DBM7 helicopter sites ==
1.  [[West Kuparuk met]]:
+
1.  [[Shaviovik River | Shaviovik R]]:  
* Troubleshoot station
+
* Set up GPS network and survey TBMs / water levels (4+ hours)
* Install SR50
+
* Install 6' rebar for new and better TBM (install to 5' deep?) (2 hours)
* Add bark chips, trim vegetation
+
* move PTs into water as needed (1 hours)
* Measure distance from ground to snow sensor
+
* Move/secure PTs (1 hours)
* Take photos of site and snow sensor area
+
* run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
 +
* Discharge Measurement (rio grande w/ zodiac or SP / kayak) (4 hours)
  
2. [[dfm4| DFM4 NW Kuparuk Met]] DFM4 :   
+
2. [[No Name River U1| U1 Cr]]:   
* '''Add Electric Fence'''
+
* Set up GPS network and survey TBMs / water levels (4+ hours)
* Check soil moisture sensors to make sure they are plugged in, soil moisture #1 looks out of QC range.
+
* Install 6' rebar for new and better TBM (install to 5' deep?) (2 hours)
* Add bark chips, trim vegetation
+
* move PTs into water as needed (1 hours)
* Measure distance from ground to snow sensor
+
* Move/secure PTs (1 hours)
* Take photos of site and snow sensor area
+
* run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
 +
* Discharge Measurement (wading stream pro or ADP flow tracker) (2 hours)
  
3. [[dfm2| DFM2 White Hills met]]:
+
3. [[Kadleroshilik River| Kadleroshilik R]]:  
* '''Replace SR50.'''  Measure old distance to ground and then measure new dist. after installation.
+
* remove HOBO and download data (1 hour)
* '''Check or Replace Anemometer'''.  Bring spare cable and spare anemometer.  Wind speed/direction are 0 since 7/17.
+
* Set up GPS network and survey TBMs / water levels (4+ hours)
* Measure distance from ground to snow sensor
+
* Install 6' rebar for new and better TBM (install to 5' deep?) and survey (2 hours)
* Take photos of site and snow sensor area
+
* move PTs into water as needed (1 hours)
* trim vegetation
+
* Move/secure PTs (1 hours)
 +
* run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
 +
* Discharge Measurement (stream pro w/ kayak or wading ADP flow tracker) (2-3 hours)
  
4. [[dfm3| DFM3 North White Hills Met]]
+
4. [[dbm7| DBM7 Kadleroshilik Met]]
* Add bark chips
+
* Replace SR50. Measure old distance to ground and then measure new dist. after installation.
* Measure distance from ground to snow sensor
 
* Take photos of site and snow sensor area
 
* trim vegetation
 
* check soil temp profile to make sure they are wired in
 
  
5. [[dfm1| DFM1 South White Hills Met]]  
+
5. [[dbm8| DBM8 Bullen Met]]  
* '''Troubleshoot program'''
+
* Replace SR50.  Measure old distance to ground and then measure new dist. after installation.
* '''Replace SR50.''' Measure old distance to ground and then measure new dist. after installation.
 
* Add bark chips, trim vegetation
 
* Measure distance from ground to snow sensor
 
* Take photos of site and snow sensor area
 
  
== Day 3 (Bullen Area/Kavik Area) helicopter sites ==
+
6.  [[dfm4| DFM4 Northwest Kuparuk Met]]
 +
*replace SR50 transducer. Measure old distance to ground and then measure new dist. after installation.
  
 +
== Day 4, 5, 6 (Sept 6-8) Anaktuvuk River, Itkillik River, Chandler River helicopter sites  ==
  
6. [[dbm7| DBM7 Kadleroshilik Met]]
+
7. [[Chandler R| Chandler R]]
* '''Check (or replace) net radiometer''' - readings went bad after we left the site
+
* remove HOBO and download data (1 hour)
* Add bark chips, trim vegetation
+
* Set up GPS network and survey TBMs / water levels (4+ hours) ??
* Measure distance from ground to snow sensor
+
* Install 6' rebar for new and better TBM (install to 5' deep?) and survey (2 hours)
* Take photos of site and snow sensor area
+
* move PTs into water as needed (1 hours)
 +
* Move/secure PTs (1 hours)
 +
* run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
 +
* Check battery box therm
 +
* air temp backup (ATB?) not working?
 +
* soil surface temp not working
 +
* turn one camera to a different direction
  
7.  [[dbm8| DBM8 Bullen Met]] DBM8
 
* Add bark chips, trim vegetation
 
* Measure distance from ground to snow sensor
 
* Take photos of site and snow sensor area
 
  
8. [[dbm4| DBM4 Sag-Ivi Met]] DBM4: 
+
8. [[Itikillik R| Itkillik R]]
* '''Add E-Fence'''
+
* turn one camera to a different direction
* Add bark chips, trim vegetation
+
** suggest point "B" camera toward Itigaknit Mtn
* Measure distance from ground to snow sensor
+
* air temp backup (ATB?) not working?
* Take photos of site and snow sensor area
+
* soil surface temp not working
 +
* move higher PT into water
 +
* Set up GPS network and survey TBMs / water levels (4+ hours) ??
 +
* Install 6' rebar for new and better TBM (install to 5' deep?) and survey (2 hours)
 +
* move PTs into water as needed (1 hours)
 +
* Move/secure PTs (1 hours)
 +
* run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
  
 +
9.  [[dfm1| DFM1 South White Hills Met]]
 +
* Replace SR50 transducer
 +
* Check and have on hand replacement SR50 cable
 +
* check solar panel wiring (frequent drops in voltage)
 +
* check antenna cable & connections; many connection attempts fail
  
9. [[dbm5| DBM5 Upper Kad Met]] DBM5: 
+
10. [[Anaktuvuk R| Anaktuvuk R]]
* Add bark chips, trim vegetation
+
* Discharge msmst (Rio grande w/ zodiac or SP / kayak) (stream team)
* Measure distance from ground to snow sensor
+
* Set up GPS network and survey TBMs / water levels (4+ hours) ??
* Take photos of site and snow sensor area
+
* Install 6' rebar for new and better TBM (install to 5' deep?) and survey (2 hours)
* '''Add E-Fence???'''
+
* move PTs into water as needed (1 hours)
 +
* Move/secure PTs (1 hours)
 +
* run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
 +
* Discharge Measurement (stream pro w/ kayak or wading ADP flow tracker) (2-3 hours)
 +
* Add bark chips and snow depth height needs to be entered into the data logger (GWS met team Sept 9-12)
 +
* RH had some problems ~May 29.  It looks ok now, but may want to check (GWS met team Sept 9-12)
 +
* Install subsurface soil moisture and temp thermistors (GWS met team Sept 9-12)
 +
* Secure Gieck Base to ground with deep rebar in non-rocky areas. (GWS Met Team - this may or may not have been done at some stations already)
  
10. [[dbm6| DBM6 Kavik Met]]
+
11. [[dbm1| DBM1 Accomplishment Cr Met]]  
* Add bark chips, trim vegetation
+
* Replace rain gage mesh
* Measure distance from ground to snow sensor
+
* '''Wind speed and direction are giving readings of zero'''
* Take photos of site and snow sensor area
+
** replace RMYoung sensor -- spare is in Kanex
  
== Day 4 & 5 (Mountain Sites) helicopter sites ==
+
== Days 7, 8, 9 (Sept 9-12) Umiat Project Met Station installation -- GWS ==
  
11. [[dbr2| DBR2 Ribdon Repeater]] DBR2 Troubleshooting
+
12. [[Itikmalakpak| DUM1 Itikmalakpak ]]
* Needs HMP45C
+
* Download data and upgrade logger to v. 17
* Needs YSIx3
+
* Install bark chips as needed and check snow sensor height
* Add conduit
+
* Install subsurface soil moisture and temp thermistors
 +
* Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)
  
12. [[dbm3| DBM3 Juniper Met]] DBM3 
+
13. [[Upper May Creek| DUM2 Upper May Cr Met]]
* North fence needs another post,
+
* Download data and upgrade logger to v. 17
* solar panel wires are exposed, needs "plates" or other protection
+
* Install bark chips as needed and check snow sensor height
* install conduit
+
* Bring additional fenceposts and fence wire to expand fence around rain gage and met pole. 
* Swap HMP45C
+
* Net rad sensor was pointing directly down at a bunch of flex conduit, better position sensor
* Add bark chips, trim vegetation  (if needed)
+
* Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)
* Measure distance from ground to snow sensor
 
* Take photos of site and snow sensor area
 
  
13. [[dbm1| DBM1 Accomplishment Cr Met]]  
+
14. [[Nanushuk| DUM3 Nanushuk Met]]
* Swap HMP45C
+
* Download data and upgrade logger to v. 17
* install conduit if time permits
+
* Install bark chips as needed and check snow sensor height
* install solar panel plate (larger size)
+
* Install subsurface soil moisture and temp thermistors
* Add bark chips, trim vegetation (if needed)
+
* Bring additional fenceposts and fence wire to expand fence around rain gage and met pole.
* Measure distance from ground to snow sensor
+
* Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)
* Take photos of site and snow sensor area
 
  
14. [[dbm2| DBM2 Ribdon Cr Met]] DBM2
+
15. [[Tuluga| DUM4 Tuluga Met]]
* Swap HMP45C
+
* Download data and upgrade logger to v. 17
* install conduit
+
* Install bark chips as needed and check snow sensor height
* Add bark chips, trim vegetation (if needed)
+
* Install subsurface soil moisture and temp thermistors
* Measure distance from ground to snow sensor
+
* Bring additional fenceposts and fence wire to expand fence around rain gage and met pole.
* Take photos of site and snow sensor area
+
* Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)
  
== ''Other TO DO things not helicopter related'' ==
+
16.  [[Anaktuvuk R| Anaktuvuk R]]
 +
* Add bark chips and snow depth height needs to be entered into the data logger (GWS met team Sept 9-12)
 +
* RH had some problems ~May 29.  It looks ok now, but may want to check (GWS met team Sept 9-12)
 +
* Install subsurface soil moisture and temp thermistors (GWS met team Sept 9-12)
 +
* Secure Gieck Base to ground with deep rebar in non-rocky areas. (GWS Met Team - this may or may not have been done at some stations already)
  
== Emily and Rob head up to Deadhorse and gage the Put River Sept 6-7 ==
 
*Remember to check [[NSF Sites Notes from Bob]]
 
  
== Imnaviat Flume ==
+
== ''Other TO DO things at Met Stations if time permits'' ==
*Install a new larger solar panel and battery
 
*Gage the site
 
*repairs to wingwalls as needed
 
*See [[NSF Sites Notes from Bob]]
 
  
== Upper Kuparuk ==
 
*Gage the site
 
*See [[NSF Sites Notes from Bob]]
 
  
== Toolik snow sensor test site ==
+
17.  [[dbm3| DBM3 Juniper Met]]  DBM3:
 +
* Replace rain gage mesh
  
*Toolik Geonor T200B precip gauge site prep
+
18.  [[dbm4| DBM4 Sag-Ivi Met]] DBM4: 
 +
* Check E-Fence
  
** select site location
+
19.  [[dfm2| DFM2 White Hills Met]]
*** need 120VAC power
+
*check soil moisture wiring (irregular spikes through winter 2008/09
** install concrete base block
+
*check soil temp, went bad in May 08 (bear damage?)
*** dig hole for about 6CF concrete
 
*** prepare template for 4 bolts, 225cm apart
 
*** mix and place concrete
 
*** set bolts in place; orient N-S and E-W, leave 6" above surface
 
*** protect from elements etc. until set
 
** sensor to be installed later...
 
  
*Install SR50 snow sensor
+
20.  [[dbr4| DBR4 Kavik Rep]]
**SR50's, wood chips, etc.
+
*GWS YSI Air T Thermistor #1 is reporting out of range data
**Mounting equipment
+
*GWS YSI Batt Box T Thermistor #1 is reporting out of range data
**datalogger
+
 
**hmp45c/anememometer?
+
21.  [[dfr1| DFR1 Kak Rep]]
**wood chips
+
*HMP45C AirT & HMP45C RH are reporting out of range data (replacement?)
**Battery, solar panel, charge controller ?
+
 
**radio/antennae?
+
22. [[dfr3| DFR3 Shell Pingo]]
 +
*Install camera
 +
*GWS YSI Air T Thermistor #1 is reporting out of range data
 +
 
 +
23.  [[Tuvuk Rep| DUR5 Tuvuk Repeater]]
 +
* Battery box temp is irregular/ not always taking readings
 +
* Soil Surface Temp not recording

Latest revision as of 09:49, 1 September 2009

This is a to do list detailing work to be done on the Sept 2-13 field trip. Stream Team (Ken, Emily, Horacio/Bill, Jeff Derry, Bill Lee ) Sept 2-8 or so working out of Prudhoe first, then moving to Toolik. Met Team (Mike L., Jeff D., 3rd person) Sept 9-13 or so working out of Toolik.

Reminders

  • Remember to make reservations at Toolik (& bring your own sleeping bag/sheets/blankets/pillow).
  • Remember to get rooms in Deadhorse.

Field Notes

  • Bring additional fenceposts/e-fence wire/hardware
  • Bring SR50 transducer for replacements (change out at all stations on Coastal Plain)
  • Remove Bullen/Foothills net rad sensors for recalibration (every two years)
  • Bring spare rain grates (US and metric). Check all rain gauges and record in notes whether US or metric gauge.
  • Bring a bunch of black campbell SC12 2 peripheral cables (or whatever they are) to leave at new stations/repeaters, they were missing at Itikmalakpak & May Creek.
  • Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)
  • Apparently some of the tilt down tripods were installed so that they could not be tilted down due to the solar panel being in the way. If time permits, this could be fixed, we use this feature often.
  • Note that the program file names are TOO LONG making it impossible to figure out which program is running and impossible to select the correct program to edit. Ken please fix this and the other problems in the programs so we can reload via radio them right before the fall trip (and notice if there are other problems, then at least we can fix during the site visit).
  • Bark chips should be added where needed. We should have some up at Toolik but I didn't notice them on the last trip (but I wasn't looking).
  • Load updated firmware to datalogger (v. 17)


Day 0, Drive to Deadhorse (Sept 1/2) -- UAF

  • Emily/Bill Lee drives to Toolik Sept 1 and then to Deadhorse Sept 2 w/ Ken
  • Jeff D. flies to Prudhoe Sept 2
  • Bill S. flies to Prudhoe Sept 3
  • Horacio arrives Sept 4/5, Bill departs Sept 5
  • Bill L. departs on Sept 6 if no GPS survey needed at Umiat river stations
  • Horacio departs Toolik Sept 7 for Prudhoe or Fairbanks

Day 1, 2, 3 (Sept 3-5) Shaviovik, U1, Kadleroshilik River, Bullen DBM8, Lower Kad DBM7 helicopter sites

1. Shaviovik R:

  • Set up GPS network and survey TBMs / water levels (4+ hours)
  • Install 6' rebar for new and better TBM (install to 5' deep?) (2 hours)
  • move PTs into water as needed (1 hours)
  • Move/secure PTs (1 hours)
  • run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
  • Discharge Measurement (rio grande w/ zodiac or SP / kayak) (4 hours)

2. U1 Cr:

  • Set up GPS network and survey TBMs / water levels (4+ hours)
  • Install 6' rebar for new and better TBM (install to 5' deep?) (2 hours)
  • move PTs into water as needed (1 hours)
  • Move/secure PTs (1 hours)
  • run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
  • Discharge Measurement (wading stream pro or ADP flow tracker) (2 hours)

3. Kadleroshilik R:

  • remove HOBO and download data (1 hour)
  • Set up GPS network and survey TBMs / water levels (4+ hours)
  • Install 6' rebar for new and better TBM (install to 5' deep?) and survey (2 hours)
  • move PTs into water as needed (1 hours)
  • Move/secure PTs (1 hours)
  • run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
  • Discharge Measurement (stream pro w/ kayak or wading ADP flow tracker) (2-3 hours)

4. DBM7 Kadleroshilik Met

  • Replace SR50. Measure old distance to ground and then measure new dist. after installation.

5. DBM8 Bullen Met

  • Replace SR50. Measure old distance to ground and then measure new dist. after installation.

6. DFM4 Northwest Kuparuk Met

  • replace SR50 transducer. Measure old distance to ground and then measure new dist. after installation.

Day 4, 5, 6 (Sept 6-8) Anaktuvuk River, Itkillik River, Chandler River helicopter sites

7. Chandler R

  • remove HOBO and download data (1 hour)
  • Set up GPS network and survey TBMs / water levels (4+ hours) ??
  • Install 6' rebar for new and better TBM (install to 5' deep?) and survey (2 hours)
  • move PTs into water as needed (1 hours)
  • Move/secure PTs (1 hours)
  • run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
  • Check battery box therm
  • air temp backup (ATB?) not working?
  • soil surface temp not working
  • turn one camera to a different direction


8. Itkillik R

  • turn one camera to a different direction
    • suggest point "B" camera toward Itigaknit Mtn
  • air temp backup (ATB?) not working?
  • soil surface temp not working
  • move higher PT into water
  • Set up GPS network and survey TBMs / water levels (4+ hours) ??
  • Install 6' rebar for new and better TBM (install to 5' deep?) and survey (2 hours)
  • move PTs into water as needed (1 hours)
  • Move/secure PTs (1 hours)
  • run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)

9. DFM1 South White Hills Met

  • Replace SR50 transducer
  • Check and have on hand replacement SR50 cable
  • check solar panel wiring (frequent drops in voltage)
  • check antenna cable & connections; many connection attempts fail

10. Anaktuvuk R

  • Discharge msmst (Rio grande w/ zodiac or SP / kayak) (stream team)
  • Set up GPS network and survey TBMs / water levels (4+ hours) ??
  • Install 6' rebar for new and better TBM (install to 5' deep?) and survey (2 hours)
  • move PTs into water as needed (1 hours)
  • Move/secure PTs (1 hours)
  • run level loops from TBMs to water levels/staff/rebar tape downs (1 hour)
  • Discharge Measurement (stream pro w/ kayak or wading ADP flow tracker) (2-3 hours)
  • Add bark chips and snow depth height needs to be entered into the data logger (GWS met team Sept 9-12)
  • RH had some problems ~May 29. It looks ok now, but may want to check (GWS met team Sept 9-12)
  • Install subsurface soil moisture and temp thermistors (GWS met team Sept 9-12)
  • Secure Gieck Base to ground with deep rebar in non-rocky areas. (GWS Met Team - this may or may not have been done at some stations already)

11. DBM1 Accomplishment Cr Met

  • Replace rain gage mesh
  • Wind speed and direction are giving readings of zero
    • replace RMYoung sensor -- spare is in Kanex

Days 7, 8, 9 (Sept 9-12) Umiat Project Met Station installation -- GWS

12. DUM1 Itikmalakpak

  • Download data and upgrade logger to v. 17
  • Install bark chips as needed and check snow sensor height
  • Install subsurface soil moisture and temp thermistors
  • Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)

13. DUM2 Upper May Cr Met

  • Download data and upgrade logger to v. 17
  • Install bark chips as needed and check snow sensor height
  • Bring additional fenceposts and fence wire to expand fence around rain gage and met pole.
  • Net rad sensor was pointing directly down at a bunch of flex conduit, better position sensor
  • Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)

14. DUM3 Nanushuk Met

  • Download data and upgrade logger to v. 17
  • Install bark chips as needed and check snow sensor height
  • Install subsurface soil moisture and temp thermistors
  • Bring additional fenceposts and fence wire to expand fence around rain gage and met pole.
  • Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)

15. DUM4 Tuluga Met

  • Download data and upgrade logger to v. 17
  • Install bark chips as needed and check snow sensor height
  • Install subsurface soil moisture and temp thermistors
  • Bring additional fenceposts and fence wire to expand fence around rain gage and met pole.
  • Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)

16. Anaktuvuk R

  • Add bark chips and snow depth height needs to be entered into the data logger (GWS met team Sept 9-12)
  • RH had some problems ~May 29. It looks ok now, but may want to check (GWS met team Sept 9-12)
  • Install subsurface soil moisture and temp thermistors (GWS met team Sept 9-12)
  • Secure Gieck Base to ground with deep rebar in non-rocky areas. (GWS Met Team - this may or may not have been done at some stations already)


Other TO DO things at Met Stations if time permits

17. DBM3 Juniper Met DBM3:

  • Replace rain gage mesh

18. DBM4 Sag-Ivi Met DBM4:

  • Check E-Fence

19. DFM2 White Hills Met

  • check soil moisture wiring (irregular spikes through winter 2008/09
  • check soil temp, went bad in May 08 (bear damage?)

20. DBR4 Kavik Rep

  • GWS YSI Air T Thermistor #1 is reporting out of range data
  • GWS YSI Batt Box T Thermistor #1 is reporting out of range data

21. DFR1 Kak Rep

  • HMP45C AirT & HMP45C RH are reporting out of range data (replacement?)

22. DFR3 Shell Pingo

  • Install camera
  • GWS YSI Air T Thermistor #1 is reporting out of range data

23. DUR5 Tuvuk Repeater

  • Battery box temp is irregular/ not always taking readings
  • Soil Surface Temp not recording