site TODO list
- record as-built wiring of soil sensors
 - Flex conduit as needed
 
- need flex conduit/armoring on antenna, AT sensor cables
 - bring snap link/carabiner for white instrument enclosure
 
site logs
Sept 5, 2008, Emily & Ken
- tightened guy wires, radiation/SR50 pole was very crooked
 - Old SR50 S/n C4798 and distance to ground was variable (125 cm - 149 cm) due to uneven ground
 - Installed a new SR50 and moved it 1 foot to the north where the ground was more level
 - New SR50 S/N C4789, calibrated by R. Gieck 9/5/08
 - Reloaded new program onto datalogger (failure during transmission via radios)
 - Added bark chips under SR50 and trimmed vegetation
 - New SR50 distance from sensor to ground is 134.5 average and I put it into the program.
 - Program now reads 1.13 cm of snow, an improvement from the previous reading.
 - rain gage was leveled, it was very unlevel.
 
Future tasks:
- bring out one more fence post
 - site needs shielding and conduit
 
13 July 2007, Ken I.
- replaced missing HMP45C
- S/N C1440027
 - calibrated April 2007
 
 - yellow tags on electric fence were already taped
 - fence works (ouch)
 - site generally looks good
 - rain gauge funnel not secured
 - no carabiner/screw link on white box; used tie wrap/wire tie
 
9 June 2007, Ken I., Dan R.
- site generally looks good
 
- radiation pole is firm & true
- bird post broken off from net radiometer, found beneath
 
 
- tripod guys are taut
 
- no HMP sensor; cable cut cleanly, apparently at base of missing sensor
 
- owl pellets below solar panel; bird droppings on solar panel & battery box
 
- installed electric fence