* Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th. | * Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th. | ||
− | * | + | * Arrive on the evening on Monday Sep 24. |
− | * People: Bob | + | * People: Bob B, Anna L, Sasha K |
==Itinerary== | ==Itinerary== | ||
+ | ===Tasks=== | ||
+ | * download and maintain Campbell logger | ||
+ | ** change program to make it table data compatible | ||
+ | ** load new OS | ||
+ | ** set pakbus ID to 404 | ||
+ | * Installation of additional CSI snow depth (4) | ||
+ | ** need to add an extra sensor to one of the sites | ||
+ | ** I have the sensors, A & S have the rest of the parts | ||
+ | * move webcam 90 degrees: | ||
+ | ** short unistrut pieces (need to cut from stock in prep room) | ||
+ | ** four bolts | ||
+ | ** two angle pieces (four hole) | ||
+ | ** four strut nuts | ||
+ | ** sawzall packed | ||
+ | ** climbing harness | ||
+ | * set up base radio & usb to serial | ||
+ | ** bring a few components from Fairbanks | ||
+ | ** | ||
− | + | Oh, I was thinking for the base radio to bring the sawzall, cut the rusted ubolts on the tower and then hose clamp a new pipe in place for the base antenna | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | From my field book: | |
− | * | + | * Seal 3" Pipes |
− | ** | + | * serial cable to C (bring from FAI) |
− | ** | + | * null modem to A (at the control shed) |
− | * | + | * animal proof A |
− | * | + | * tarps to B & C |
− | + | * NRS to C | |
− | + | * mount antenna and set up rad network | |
− | + | * TC probes @ C need extending | |
− | * | + | * Need to get #5 thermal conductivity S/N at C (maybe hold off till I wire them in?) |
− | + | * Need to look at what a good value for heat flux looks like prior to the trip | |
− | |||
− | |||
− | |||
Latest revision as of 18:00, 20 September 2012
Sep field work 2012
- Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.
- Arrive on the evening on Monday Sep 24.
- People: Bob B, Anna L, Sasha K
Itinerary
Tasks
- download and maintain Campbell logger
- change program to make it table data compatible
- load new OS
- set pakbus ID to 404
- Installation of additional CSI snow depth (4)
- need to add an extra sensor to one of the sites
- I have the sensors, A & S have the rest of the parts
- move webcam 90 degrees:
- short unistrut pieces (need to cut from stock in prep room)
- four bolts
- two angle pieces (four hole)
- four strut nuts
- sawzall packed
- climbing harness
- set up base radio & usb to serial
- bring a few components from Fairbanks
Oh, I was thinking for the base radio to bring the sawzall, cut the rusted ubolts on the tower and then hose clamp a new pipe in place for the base antenna
From my field book:
- Seal 3" Pipes
- serial cable to C (bring from FAI)
- null modem to A (at the control shed)
- animal proof A
- tarps to B & C
- NRS to C
- mount antenna and set up rad network
- TC probes @ C need extending
- Need to get #5 thermal conductivity S/N at C (maybe hold off till I wire them in?)
- Need to look at what a good value for heat flux looks like prior to the trip
Potential Extra Items
- Install power from Control Shed to site C (I am not sure the power is available to us??)
- Install wireless communication to grid site (requires power)