Difference between revisions of "NGEE Nome April 2016 pt 1 Bonus Notes"

From IARC 207 Wiki
Jump to navigation Jump to search
imported>Bob
imported>Bob
Line 17: Line 17:
 
To buy for tripod station:
 
To buy for tripod station:
 
* 2 pcs 10' x 1" stick of conduit for horizontals
 
* 2 pcs 10' x 1" stick of conduit for horizontals
 +
** http://www.lowes.com/pd_72715-1792-101568___?productId=3129555&pl=1&Ntt=1%22+emt+conduit
 +
** let me see if I can find a substitute for this.
 
* 2 pcs 10' x 3/4" metal conduit for verticals
 
* 2 pcs 10' x 3/4" metal conduit for verticals
 +
** http://www.lowes.com/pd_73212-1792-103069___?productId=3129621&pl=1&Ntt=3%2F4+inch+metal+conduit
 
* 2 pcs 2" dia x 3" long x 5/6" u-bolt (stainless preferred)
 
* 2 pcs 2" dia x 3" long x 5/6" u-bolt (stainless preferred)
 +
** http://www.lowes.com/pd_446093-37672-320876___?productId=4406795&pl=1&Ntt=stainless+steel+u-bolt  (this is the size... I know they are sold cheaper than this...)
 
* 6 pcs -- 1.5" x 1/4-20 bolts  
 
* 6 pcs -- 1.5" x 1/4-20 bolts  
 +
** http://www.lowes.com/pd_135613-37672-880004___?productId=3012026&pl=1&Ntt=1%2F4-20+x+1.5+inch+bolts
  
 
Prep work still to go:
 
Prep work still to go:
 
* finalize survival stuff
 
* finalize survival stuff
 
*
 
*

Revision as of 08:42, 30 March 2016

  • pipe
  • 2 pieces of 5ft w/
  • 6pcs -- 1.5" x 1/4-20 bolts for
  • should refresh on the pin outs for the iridium.


Station Tripod setup:

  • survey tripod
  • 1 pcs 1/2 height unistrut bolted to survey tripod using:
    • 2 pcs 1/4" fender washer
    • 2pcs 1/4" unistrut nut deals
    • 2 pcs 1.5" x 1/4-20 bolts
  • 1" horizontal pipe cut to 2 5' sections and coupled in middle
  • secure horizontal pipe to unistrut using two u-bolts

To buy for tripod station:

Prep work still to go:

  • finalize survival stuff