Line 6: Line 6:
 
* Pack up Surface Water Station for winter
 
* Pack up Surface Water Station for winter
 
* Duct seal up all instrument box holes
 
* Duct seal up all instrument box holes
 +
* Final Discharge Measurement of season
  
 
====In Nome Storage:====
 
====In Nome Storage:====

Revision as of 18:34, 30 August 2016

Teller Bottom @ TL_DS_1

To Do:

  • Get SRS sensors running
  • Get Thermal Conductivity sensors running
  • Jumper for batteries
  • Pack up Surface Water Station for winter
  • Duct seal up all instrument box holes
  • Final Discharge Measurement of season

In Nome Storage:

  • jumpers for last battery
  • soil sampling cylinders for soil pit
  • Cable spools for Pressure transducers

At Site

  • duct seal for all connections
  • soil pit sensors in large actionpacker

Extras

  • think about how to mount iridium here...
  • Bring covers from Fairbanks to cover unitstrut ends like tennis balls.

Left to fix

  • Decagon SRS sensors... test again in Fairbanks
  • Thermal Conductivity sensors... figure out their deal...
  • Review fieldbook

Teller Top @ TL_IS5

Remaining To Do for fall

  • Bring out a charge controller for solar panel
  • soil samples from soil pit
  • soil pit sensors are in a large actionpacker next to tower.

Kougarok M64

  • Add ground control survey point if permitted

Skookum Pass

  • Add Satellite Components

Kougarok Old Sites

  • Download data over the radio network

Council Old Sites

  • Look for camera at Blueberry site