+ | Visited 9/12 and 9/14 | ||
* Check out 1m AT/RH | * Check out 1m AT/RH | ||
+ | ** 9/14 replaced with borrowed unit from toolik | ||
* Bring out battery for UPS system | * Bring out battery for UPS system | ||
+ | ** double-check battery voltages next time out. | ||
* toughbook | * toughbook | ||
− | * | + | * replaced bottom two wind sensors with new units |
+ | * sending old units for recalibration | ||
* Tour with Go | * Tour with Go | ||
* put small toughbook on UPS system | * put small toughbook on UPS system | ||
− | * | + | * 9/14 changed all MD485s at site to Pakbus protocol rather than transparent to see if this helps with data retrieval using python. |
+ | * worked a bit on boardwalk | ||
+ | * pounded in grounding rod | ||
+ | * hooked second laptop to UPS |
Latest revision as of 12:21, 14 September 2017
Visited 9/12 and 9/14
- Check out 1m AT/RH
- 9/14 replaced with borrowed unit from toolik
- Bring out battery for UPS system
- double-check battery voltages next time out.
- toughbook
- replaced bottom two wind sensors with new units
- sending old units for recalibration
- Tour with Go
- put small toughbook on UPS system
- 9/14 changed all MD485s at site to Pakbus protocol rather than transparent to see if this helps with data retrieval using python.
- worked a bit on boardwalk
- pounded in grounding rod
- hooked second laptop to UPS