Difference between revisions of "NGEE To Do Next Visit"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
===Seward Peninsula===
 
===Seward Peninsula===
 +
[[2018 NGEE Nome June Trip]]
 
* Replace broken precip bucket @ Teller Bottom
 
* Replace broken precip bucket @ Teller Bottom
 
* Replace broken precip bucket @ Koug m64
 
* Replace broken precip bucket @ Koug m64

Revision as of 14:39, 4 June 2018

Seward Peninsula

2018 NGEE Nome June Trip

  • Replace broken precip bucket @ Teller Bottom
  • Replace broken precip bucket @ Koug m64
  • Replace Desiccant deal for radiometers
  • SR50A transducer replacement
  • Bring out additional desiccant?
  • Teller SW desiccant replacement
  • Data Download
  • Redrill hole for C1 Grid temperature probe
  • Teller Bottom Program Send
  • Measure Creek Flow
  • Re-level radiometers
  • Put out Divers for wells with Nathan
  • Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
    • Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
    • Also related: perhaps add a second string up at teller top?


Utqiagvik

  • Intensive Site C HMP155 failed