Line 16: | Line 16: | ||
** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements. | ** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements. | ||
** Also related: perhaps add a second string up at teller top? | ** Also related: perhaps add a second string up at teller top? | ||
− | + | * 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod | |
===Utqiagvik=== | ===Utqiagvik=== | ||
* Intensive Site C HMP155 failed | * Intensive Site C HMP155 failed |
Revision as of 11:38, 11 June 2018
Seward Peninsula
- Replace broken precip bucket @ Teller Bottom
- Replace broken precip bucket @ Koug m64
- Replace Desiccant deal for radiometers
- SR50A transducer replacement
- Bring out additional desiccant?
- Teller SW desiccant replacement
- Data Download
- Redrill hole for C1 Grid temperature probe
- Teller Bottom Program Send
- Measure Creek Flow
- Re-level radiometers
- Put out Divers for wells with Nathan
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?
- 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod
Utqiagvik
- Intensive Site C HMP155 failed