===To Buy===
 +
* Step ladder for teller bottom
 +
*
 +
 
===Seward Peninsula===
 
===Seward Peninsula===
[[2018 NGEE Nome June Trip]]
+
[[2018 NGEE Nome September Trip]]
 
* SR50A transducer replacement (fall activity)
 
* SR50A transducer replacement (fall activity)
 
* bring out one step stool to level teller bottom radiometer.
 
* bring out one step stool to level teller bottom radiometer.
 
* bring out tap, die, drill, drill bit, screw for teller bottom radiometer.
 
* bring out tap, die, drill, drill bit, screw for teller bottom radiometer.
* also replace cnr4 desiccant since the unit didn't look like it was sealing right with this missing screw.
+
** screw...
* Bring out additional desiccant? for box
+
* '''also replace cnr4 desiccant since the unit didn't look like it was sealing right with this missing screw.'''
* Teller SW desiccant replacement
+
* '''Bring out additional desiccant? for box'''
 +
* '''Teller SW desiccant replacement'''
 
* Redrill hole for C1 Grid temperature probe
 
* Redrill hole for C1 Grid temperature probe
 +
** what is needed for this?
 
* Measure Creek Flow
 
* Measure Creek Flow
 +
** salt slug, n=6 samples of 100g
 
* Re-level radiometers
 
* Re-level radiometers
* Measure thermistors at Teller Bottom and add them to fieldbook.
+
* Measure thermistors resistances at Teller Bottom and add them to fieldbook.
 +
** There are a couple with a 0.5C offset at spring freezing point so I think they may be failing and or something...
 
** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
 
** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
 
** Also related: perhaps add a second string up at teller top?
 
** Also related: perhaps add a second string up at teller top?
 
** sort of some additional homework is that I saw instability in a number of thermistors when measuring up top.  I suspect but haven't verified that this instability is an indicator for the wonky temperatures seen in the data but need to confirm.
 
** sort of some additional homework is that I saw instability in a number of thermistors when measuring up top.  I suspect but haven't verified that this instability is an indicator for the wonky temperatures seen in the data but need to confirm.
 
* 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails.  Would be good to grab three for the Teller SW solar panel tripod
 
* 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails.  Would be good to grab three for the Teller SW solar panel tripod
* Koug M64 Ngee tipping bucket stand is 1" aluminum pipe (verified by photo)
 
* Teller Bottom tipping bucket stands: 3/4" aluminum pipe (it appears)
 
 
* I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness.
 
* I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness.
  
Line 29: Line 35:
 
** manual
 
** manual
 
* electrical tape
 
* electrical tape
* We (Nathan and I) set up a reach to use for salt slug method discharge estimates.  It seemed to work great... though we haven't worked up the data...
+
* We (Nathan and I) set up a reach to use for salt slug method discharge estimates.   
  
 
==== Radiation Level:====
 
==== Radiation Level:====
Line 41: Line 47:
 
* K&Z desiccant pack
 
* K&Z desiccant pack
 
* anti-corrosion goo
 
* anti-corrosion goo
 +
 
====Teller Top Soil Temperatures====
 
====Teller Top Soil Temperatures====
 
* Volt meter
 
* Volt meter

Revision as of 09:40, 27 August 2018

To Buy

  • Step ladder for teller bottom

Seward Peninsula

2018 NGEE Nome September Trip

  • SR50A transducer replacement (fall activity)
  • bring out one step stool to level teller bottom radiometer.
  • bring out tap, die, drill, drill bit, screw for teller bottom radiometer.
    • screw...
  • also replace cnr4 desiccant since the unit didn't look like it was sealing right with this missing screw.
  • Bring out additional desiccant? for box
  • Teller SW desiccant replacement
  • Redrill hole for C1 Grid temperature probe
    • what is needed for this?
  • Measure Creek Flow
    • salt slug, n=6 samples of 100g
  • Re-level radiometers
  • Measure thermistors resistances at Teller Bottom and add them to fieldbook.
    • There are a couple with a 0.5C offset at spring freezing point so I think they may be failing and or something...
    • Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
    • Also related: perhaps add a second string up at teller top?
    • sort of some additional homework is that I saw instability in a number of thermistors when measuring up top. I suspect but haven't verified that this instability is an indicator for the wonky temperatures seen in the data but need to confirm.
  • 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod
  • I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness.

Teller SW Flow

  • cloth tape
    • left a small cloth tape at the site
  • metal meter stick or folding tape
    • left a metal meter stick at the site
  • flow tracker
  • fieldbook
  • YSI conductivity meter
    • manual
  • electrical tape
  • We (Nathan and I) set up a reach to use for salt slug method discharge estimates.

Radiation Level:

  • step ladder
  • a bit of wood to provide better base for step ladder
  • phillips screwdriver for level

Radiation Desiccant Swap:

  • Step ladder
  • small CSI phillips
  • K&Z desiccant pack
  • anti-corrosion goo

Teller Top Soil Temperatures

  • Volt meter
  • fieldbook
    • learned but need to confirm that the thermistors with a capacitance are ones that are unstable and failing.

Utqiagvik

  • Intensive Site C HMP155 failed
  • need to replace the network cable running from the computer to the network switch. It cuts out with minimal bumping.... but station is finally back online!!!
  • Site A SR50A transducers have failed
  • some subsurface items are beginning to fail.
  • bring up clear tape and a biz card to label the computer
  • bring up the nuc plate and wood screws and other screw packet to mount nuc to wall