(Created page with "===Monday 6/11=== * Nathan W arrives ===Tuesdya 6/12=== * Bob Busey arrives * head out to Teller * download station data at bottom *") |
|||
Line 1: | Line 1: | ||
+ | [[NGEE To Do Next Visit]] | ||
===Monday 6/11=== | ===Monday 6/11=== | ||
* Nathan W arrives | * Nathan W arrives | ||
− | === | + | |
+ | ===Tuesday 6/12: Teller Day 1=== | ||
* Bob Busey arrives | * Bob Busey arrives | ||
* head out to Teller | * head out to Teller | ||
* download station data at bottom | * download station data at bottom | ||
− | * | + | * Teller Bottom Program Send |
+ | * Replace broken precip bucket @ Teller Bottom | ||
+ | * Replace Desiccant deal for Teller Bottom radiometer | ||
+ | * Re-level radiometer & precip bucket | ||
+ | * Teller SW desiccant replacement | ||
+ | * Install Divers on bottom of hill sites | ||
+ | * Data Download | ||
+ | * Measure Flow in the Creek | ||
+ | |||
+ | ===Wednesday 6/13: Teller Day 2=== | ||
+ | * Replace Desiccant deal for Teller Top radiometer | ||
+ | ** Bring out ladder | ||
+ | * Re-level radiometer | ||
+ | * Data Download @ Teller Top | ||
+ | * Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook. | ||
+ | ** Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements. | ||
+ | ** Also related: perhaps add a second string up at teller top? | ||
+ | |||
+ | ===Thursday 6/14: Kougarok Day 1=== | ||
+ | * Replace broken precip bucket @ Koug m64 | ||
+ | * Data Download | ||
+ | * Replace Desiccant deal for radiometer | ||
+ | * Re-level radiometer | ||
+ | * Bring out additional desiccant? | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | * Measure Creek Flow | ||
+ | * Re-level radiometers | ||
+ | * Put out Divers for wells with Nathan |
Revision as of 08:43, 22 May 2018
Contents
Monday 6/11
- Nathan W arrives
Tuesday 6/12: Teller Day 1
- Bob Busey arrives
- head out to Teller
- download station data at bottom
- Teller Bottom Program Send
- Replace broken precip bucket @ Teller Bottom
- Replace Desiccant deal for Teller Bottom radiometer
- Re-level radiometer & precip bucket
- Teller SW desiccant replacement
- Install Divers on bottom of hill sites
- Data Download
- Measure Flow in the Creek
Wednesday 6/13: Teller Day 2
- Replace Desiccant deal for Teller Top radiometer
- Bring out ladder
- Re-level radiometer
- Data Download @ Teller Top
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?
Thursday 6/14: Kougarok Day 1
- Replace broken precip bucket @ Koug m64
- Data Download
- Replace Desiccant deal for radiometer
- Re-level radiometer
- Bring out additional desiccant?
- Measure Creek Flow
- Re-level radiometers
- Put out Divers for wells with Nathan