Line 39: | Line 39: | ||
===Friday 6/15: Loose ends=== | ===Friday 6/15: Loose ends=== | ||
* Fly out Friday evening | * Fly out Friday evening | ||
+ | |||
+ | ===Fairbanks Remaining Prep=== | ||
+ | * calibrate replacement tipping buckets | ||
+ | * put box of gear together for trip | ||
+ | * Track down SC32B | ||
+ | * Finish looking at data. |
Revision as of 14:24, 23 May 2018
Contents
Monday 6/11
- Nathan W arrives, staying at Dredge
- Reservation Confirmation Number: 479315
Tuesday 6/12: Teller Day 1
- Bob Busey arrives, staying at Dredge
- Reservation Confirmation Number: 964080
- head out to Teller
- download station data at bottom
- Teller Bottom Program Send
- Replace broken precip bucket @ Teller Bottom
- Replace Desiccant deal for Teller Bottom radiometer
- Re-level radiometer & precip bucket
- Teller SW desiccant replacement
- Install Divers on bottom of hill sites
- Data Download
- Measure Flow in the Creek
Wednesday 6/13: Teller Day 2
- Replace Desiccant deal for Teller Top radiometer
- Bring out ladder
- Re-level radiometer
- Data Download @ Teller Top
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?
- Finish deploying divers with Nathan
Thursday 6/14: Kougarok Day 1
- Replace broken precip bucket @ Koug m64
- Data Download
- Replace Desiccant deal for radiometer
- Re-level radiometer
- Bring out additional desiccant?
- Put out divers for wells with Nathan
- Stretch goal: download old UAF station data by radio at end of road
Friday 6/15: Loose ends
- Fly out Friday evening
Fairbanks Remaining Prep
- calibrate replacement tipping buckets
- put box of gear together for trip
- Track down SC32B
- Finish looking at data.