Difference between revisions of "2018 NGEE Nome June Trip"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
===Tuesday 6/12: Teller Day 1=== | ===Tuesday 6/12: Teller Day 1=== | ||
− | * Bob Busey arrives, | + | * Bob Busey arrives |
+ | ** Flight: Alaska 151 | ||
+ | ** Nome (OME) on Tue, Jun 12 at 7:49 am | ||
+ | * Staying at Dredge | ||
** Reservation Confirmation Number: 964080 | ** Reservation Confirmation Number: 964080 | ||
* head out to Teller | * head out to Teller | ||
Line 18: | Line 21: | ||
* Measure Flow in the Creek | * Measure Flow in the Creek | ||
** (I'm hoping LANL salt diffusion method here). | ** (I'm hoping LANL salt diffusion method here). | ||
+ | ** Flow intercomparison experiment. We will measure several different ways. | ||
===Wednesday 6/13: Teller Day 2=== | ===Wednesday 6/13: Teller Day 2=== |
Revision as of 11:02, 5 June 2018
Contents
Monday 6/11
- Nathan W arrives, staying at Dredge
- Reservation Confirmation Number: 479315
Tuesday 6/12: Teller Day 1
- Bob Busey arrives
- Flight: Alaska 151
- Nome (OME) on Tue, Jun 12 at 7:49 am
- Staying at Dredge
- Reservation Confirmation Number: 964080
- head out to Teller
- download station data at bottom
- Teller Bottom Program Send
- Replace broken precip bucket @ Teller Bottom
- Replace Desiccant deal for Teller Bottom radiometer
- Re-level radiometer & precip bucket
- Teller SW desiccant replacement
- Install Divers on bottom of hill sites
- Data Download
- Measure Flow in the Creek
- (I'm hoping LANL salt diffusion method here).
- Flow intercomparison experiment. We will measure several different ways.
Wednesday 6/13: Teller Day 2
- Replace Desiccant deal for Teller Top radiometer
- Bring out ladder
- Re-level radiometer
- Data Download @ Teller Top
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?
- Finish deploying divers with Nathan
Thursday 6/14: Kougarok Day 1
- Replace broken precip bucket @ Koug m64
- Data Download
- Replace Desiccant deal for radiometer
- Re-level radiometer
- bring out two longer pipes to steady the radiomter pole
- Bring out additional desiccant?
- Put out divers for wells with Nathan
- Stretch goal: download old UAF station data by radio at end of road
Friday 6/15: Loose ends
- Fly out Friday evening
Anchorage Remaining Prep
- calibrate replacement tipping buckets
- put box of gear together for trip
- bring out a tape measure for creek stage
- Finish looking at data.