* Thermistor Strings and Triple Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-WkVfMDdLX3Zjc2c])  | * Thermistor Strings and Triple Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-WkVfMDdLX3Zjc2c])  | ||
* Timezone - UTC  | * Timezone - UTC  | ||
| − | * PakBus IDs - A = 400; B = 401; C = 402; D = 403  | + | * PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403  | 
====Lists====  | ====Lists====  | ||
* [[Guruplug Setup]]  | * [[Guruplug Setup]]  | ||
Revision as of 13:40, 6 August 2013
Contents
Notes
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
 - Thermistor Probe Calibrations ([1])
 - Thermistor Strings and Triple Calibrations ([2])
 - Timezone - UTC
 - PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403
 
Lists
Trips
- NGEE April 11 2012 Trip
 - NGEE September 3 2012 Trip
 - NGEE September 24 2012 Trip
 - NGEE Barrow Wiring Layout
 - NGEE Barrow Intensive Sites Initial Wiring
 - NGEE Barrow 2013 Boring Trip
 - [NGEE Barrow 2013 Site Install Trip 5/7
 - NGEE Barrow 2013 Site Install Trip June
 - NGEE Barrow 2013 Site D Install Trip August 2013
 - NGEE Barrow Remainder Items
 - CPCRW 2012-10-12
 - CPCRW 2013-07-15