Difference between revisions of "NGEE"
Jump to navigation
Jump to search
Line 24: | Line 24: | ||
* [[NGEE Barrow 2013 Site Install Trip 2|NGEE Barrow 2013 Site Install Trip June]] | * [[NGEE Barrow 2013 Site Install Trip 2|NGEE Barrow 2013 Site Install Trip June]] | ||
* [[NGEE Barrow 2013 Site D Install Trip August 2013]] | * [[NGEE Barrow 2013 Site D Install Trip August 2013]] | ||
+ | * [[March 2014 Barrow]] | ||
* [[NGEE Barrow Remainder Items]] | * [[NGEE Barrow Remainder Items]] | ||
* [[CPCRW 2012-10-12]] | * [[CPCRW 2012-10-12]] | ||
* [[CPCRW 2013-07-15]] | * [[CPCRW 2013-07-15]] |
Revision as of 11:34, 14 March 2014
Contents
Notes
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
- Thermistor Probe Calibrations ([1])
- Thermistor Strings and Triple Calibrations ([2])
- Timezone - UTC
- PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403
Lists
Trips
- NGEE April 11 2012 Trip
- NGEE September 3 2012 Trip
- NGEE September 24 2012 Trip
- NGEE Barrow Wiring Layout
- NGEE Barrow Intensive Sites Initial Wiring
- NGEE Barrow 2013 Boring Trip
- [NGEE Barrow 2013 Site Install Trip 5/7
- NGEE Barrow 2013 Site Install Trip June
- NGEE Barrow 2013 Site D Install Trip August 2013
- March 2014 Barrow
- NGEE Barrow Remainder Items
- CPCRW 2012-10-12
- CPCRW 2013-07-15