Difference between revisions of "NGEE"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
 (→Notes)  | 
				 (→Trips)  | 
				||
| Line 31: | Line 31: | ||
* [[March 2014 Barrow]]  | * [[March 2014 Barrow]]  | ||
* [[August 2014 Barrow]]  | * [[August 2014 Barrow]]  | ||
| + | * [[NGEE December 2014 Barrow]]  | ||
* [[NGEE Barrow Remainder Items]]  | * [[NGEE Barrow Remainder Items]]  | ||
* [[CPCRW 2012-10-12]]  | * [[CPCRW 2012-10-12]]  | ||
* [[CPCRW 2013-07-15]]  | * [[CPCRW 2013-07-15]]  | ||
Revision as of 09:48, 3 December 2014
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
 - Programs:
 - NGEE Site A Instrumentation History
 - NGEE Site B Instrumentation History
 - NGEE Site C Instrumentation History
 - NGEE Site D Instrumentation History
 - NGEE Backup Instrumentation
 
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
 - Thermistor Probe Calibrations ([1])
 - Thermistor Strings and Triple Calibrations ([2])
 - Timezone - UTC
 - PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403
 
Lists
Trips
- NGEE April 11 2012 Trip
 - NGEE September 3 2012 Trip
 - NGEE September 24 2012 Trip
 - NGEE Barrow Wiring Layout
 - NGEE Barrow Intensive Sites Initial Wiring
 - NGEE Barrow 2013 Boring Trip
 - [NGEE Barrow 2013 Site Install Trip 5/7
 - NGEE Barrow 2013 Site Install Trip June
 - NGEE Barrow 2013 Site D Install Trip August 2013
 - March 2014 Barrow
 - August 2014 Barrow
 - NGEE December 2014 Barrow
 - NGEE Barrow Remainder Items
 - CPCRW 2012-10-12
 - CPCRW 2013-07-15