==Sep field work 2012==
 
==Sep field work 2012==
 
* Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.
 
* Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.
* Busey could also arrive on the evening on Monday Sep 24.
+
* Arrive on the evening on Monday Sep 24.
* People: Bob Busey, Anna Liljedahl (Cathy may be around from Sep 28 or soon after)
+
* People: Bob B, Anna L, Sasha K
  
  
 
==Itinerary==
 
==Itinerary==
 +
===Tasks===
 +
* download and maintain Campbell logger
 +
** change program to make it table data compatible
 +
** load new OS
 +
** set pakbus ID to 404
 +
* Installation of additional CSI snow depth (4)
 +
** need to add an extra sensor to one of the sites
 +
** I have the sensors, A & S have the rest of the parts
 +
* move webcam 90 degrees:
 +
** short unistrut pieces (need to cut from stock in prep room)
 +
** four bolts
 +
** two angle pieces (four hole)
 +
** four strut nuts
 +
** sawzall packed
 +
** climbing harness
 +
* set up base radio & usb to serial
 +
** bring a few components from Fairbanks
 +
**
  
===DAY 1 ( 1 person)===
+
Oh, I was thinking for the base radio to bring the sawzall, cut the rusted ubolts on the tower and then hose clamp a new pipe in place for the base antenna
* Water level wells @ all sites
 
** lowering installed wells
 
** clean each wire/sensor
 
** manually measure the water level in installed wells
 
** download data from water level loggers
 
** thaw depths at installed wells
 
===DAY 2 and 3 (2 people)===
 
* Water level wells @ all sites
 
** level surveying of water levels/wells  (*** WE NEED TO FIND A LEVEL***)
 
  
===DAY 4 (2 people)===
+
From my field book:
* Temperature/soil moisture @ grid site (Site C)
+
* Seal 3" Pipes
** download and maintain Campbell logger
+
* serial cable to C (bring from FAI)
** download all 20 Hobo loggers
+
* null modem to A (at the control shed)
** replace malfunctioning Hobo loggers
+
* animal proof A
** thaw depths at the 29 sites
+
* tarps to B & C
 
+
* NRS to C
===DAY 5 and 6 (2 people)===
+
* mount antenna and set up rad network
* thaw depth survey along transects/grids at each site (site A through D)
+
* TC probes @ C need extending
** '''CRAIG, SUSAN'S TEAM, NEED TO DGPS THAW DEPTH TRANSECTS'''
+
* Need to get #5 thermal conductivity S/N at C (maybe hold off till I wire them in?)
* change the view of the webcam at the Control Shed
+
* Need to look at what a good value for heat flux looks like prior to the trip
 
 
===DAY 7 (2 people)===
 
* Installation of additional CSI snow depth, Hobo soil temp and Hobo snow temp sensors
 
  
  

Latest revision as of 18:00, 20 September 2012

Sep field work 2012

  • Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.
  • Arrive on the evening on Monday Sep 24.
  • People: Bob B, Anna L, Sasha K


Itinerary

Tasks

  • download and maintain Campbell logger
    • change program to make it table data compatible
    • load new OS
    • set pakbus ID to 404
  • Installation of additional CSI snow depth (4)
    • need to add an extra sensor to one of the sites
    • I have the sensors, A & S have the rest of the parts
  • move webcam 90 degrees:
    • short unistrut pieces (need to cut from stock in prep room)
    • four bolts
    • two angle pieces (four hole)
    • four strut nuts
    • sawzall packed
    • climbing harness
  • set up base radio & usb to serial
    • bring a few components from Fairbanks

Oh, I was thinking for the base radio to bring the sawzall, cut the rusted ubolts on the tower and then hose clamp a new pipe in place for the base antenna

From my field book:

  • Seal 3" Pipes
  • serial cable to C (bring from FAI)
  • null modem to A (at the control shed)
  • animal proof A
  • tarps to B & C
  • NRS to C
  • mount antenna and set up rad network
  • TC probes @ C need extending
  • Need to get #5 thermal conductivity S/N at C (maybe hold off till I wire them in?)
  • Need to look at what a good value for heat flux looks like prior to the trip


Potential Extra Items

  • Install power from Control Shed to site C (I am not sure the power is available to us??)
  • Install wireless communication to grid site (requires power)