| Line 6: | Line 6: | ||
* | * | ||
* K2 site download the storage module. | * K2 site download the storage module. | ||
| + | |||
| + | * Teller | ||
| + | ** Stream measurement | ||
| + | ** put up 3m tripod | ||
| + | ** move surface water sensors to their own logger | ||
| + | ** download and shutdown snow temperature logger | ||
| + | *** disassemble and bring back to town | ||
| + | ** download data from hill top | ||
| + | ** download data from gaging station | ||
| + | |||
| + | * Blueberry site | ||
| + | ** can we take down the tower, removing the lowest section?... might that be a three person job? | ||
| + | ** | ||
| + | |||
| + | * Kougarok 10m Met | ||
| + | ** snow sensor? | ||
| + | ** shorten tower? | ||
| + | * check out battery data | ||
Revision as of 13:16, 26 May 2016
On the To Do list:
- Anvil City School station needs a propeller for the 05103
- Switch the current SR50 to a SR50A and give Bill the old SR50.
- Anvil logger could be upgraded to pakbus like we did at Skookum
- K2 site download the storage module.
- Teller
- Stream measurement
- put up 3m tripod
- move surface water sensors to their own logger
- download and shutdown snow temperature logger
- disassemble and bring back to town
- download data from hill top
- download data from gaging station
- Blueberry site
- can we take down the tower, removing the lowest section?... might that be a three person job?
- Kougarok 10m Met
- snow sensor?
- shorten tower?