2016 June Nome Trip
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
		
		
		
		
		
		
	
On the To Do list:
- Anvil City School station needs a propeller for the 05103
- we couldn't connect to the datalogger last trip
 
 - Switch the current SR50 to a SR50A and give Bill the old SR50.
 - Anvil logger could be upgraded to pakbus like we did at Skookum
 - K2 site download the storage module.
 
- Teller
- Stream measurement
 - put up 3m tripod
 - move surface water sensors to their own logger
 - download and shutdown snow temperature logger
- disassemble and bring back to town
 
 - download data from hill top
 - download data from gaging station
 
 
- C1-grid
- RH is not matching well, check sensors
 
 
- Blueberry site
- can we take down the tower, removing the lowest section?... might that be a three person job?
 - check out WS at 1m, its reading very low in comparison to 10m
 
 
- Kougarok 10m Met
- snow sensor?
 - shorten tower?
 - I have in my notes that the tower is blistering so we should bring unistrut and ubolts for next trip
 - 1m WS and temp/RH are too low to the ground, raise them up
 
 - check out battery data
 
- Kenji's site = bear creek
- hobo thermister wires broken but still reading resistances
 - bring extension wires, pipe cutter, cr10x, conduit, hose clamps, instrument box from K1
 - figure out thermister equation