Difference between revisions of "NGEE Nome April 2016 pt 1 Bonus Notes"

From IARC 207 Wiki
Jump to navigation Jump to search
imported>Bob
imported>Bob
Line 1: Line 1:
* XX Need to grab HMP155 Head tomorrow
 
* XX hook up the thermistor strings
 
* XX pick up another liquid-tite connector
 
* paint brush
 
 
* pipe
 
* pipe
* XX leather shoe oil
+
* 2 pieces of 5ft w/
* XX crimp on connectors for the button
+
* 6pcs -- 1.5" x 1/4-20 bolts for  
 
* should refresh on the pin outs for the iridium.
 
* should refresh on the pin outs for the iridium.
 +
 +
 +
Station Tripod setup:
 +
* survey tripod
 +
* 1 pcs 1/2 height unistrut bolted to survey tripod using:
 +
** 2 pcs 1/4" fender washer
 +
** 2pcs 1/4" unistrut nut deals
 +
** 2 pcs 1.5" x 1/4-20 bolts
 +
* 1" horizontal pipe cut to 2 5' sections and coupled in middle
 +
* secure horizontal pipe to unistrut using two u-bolts
 +
 +
 +
To buy for tripod station:
 +
* 2 pcs 10' x 1" stick of conduit for horizontals
 +
* 2 pcs 10' x 3/4" metal conduit for verticals
 +
* 2 pcs 2" dia x 3" long x 5/6" u-bolt (stainless preferred)
 +
* 6 pcs -- 1.5" x 1/4-20 bolts
 +
 +
Prep work still to go:
 +
* finalize survival stuff
 +
*

Revision as of 21:43, 29 March 2016

  • pipe
  • 2 pieces of 5ft w/
  • 6pcs -- 1.5" x 1/4-20 bolts for
  • should refresh on the pin outs for the iridium.


Station Tripod setup:

  • survey tripod
  • 1 pcs 1/2 height unistrut bolted to survey tripod using:
    • 2 pcs 1/4" fender washer
    • 2pcs 1/4" unistrut nut deals
    • 2 pcs 1.5" x 1/4-20 bolts
  • 1" horizontal pipe cut to 2 5' sections and coupled in middle
  • secure horizontal pipe to unistrut using two u-bolts

To buy for tripod station:

  • 2 pcs 10' x 1" stick of conduit for horizontals
  • 2 pcs 10' x 3/4" metal conduit for verticals
  • 2 pcs 2" dia x 3" long x 5/6" u-bolt (stainless preferred)
  • 6 pcs -- 1.5" x 1/4-20 bolts

Prep work still to go:

  • finalize survival stuff