Difference between revisions of "2016 NGEE September Nome Trip"
Jump to navigation
Jump to search
(Replaced content with "* Add ground control survey point if permitted") |
|||
Line 1: | Line 1: | ||
+ | ===Teller Bottom=== | ||
+ | ====In Nome Storage:==== | ||
+ | * jumpers for last battery | ||
+ | * soil sampling cylinders for soil pit | ||
+ | |||
+ | ====At Site==== | ||
+ | * duct seal for all connections | ||
+ | * soil pit sensors in large actionpacker | ||
+ | |||
+ | ====Extras==== | ||
+ | * think about how to mount iridium here... | ||
+ | *Bring covers from Fairbanks to cover unitstrut ends like tennis balls. | ||
+ | |||
+ | ====Left to fix==== | ||
+ | * Decagon SRS sensors... test again in Fairbanks | ||
+ | * Thermal Conductivity sensors... figure out their deal... | ||
+ | * Review fieldbook | ||
+ | |||
+ | ===Kougarok M64=== | ||
* Add ground control survey point if permitted | * Add ground control survey point if permitted |
Revision as of 17:16, 30 August 2016
Teller Bottom
In Nome Storage:
- jumpers for last battery
- soil sampling cylinders for soil pit
At Site
- duct seal for all connections
- soil pit sensors in large actionpacker
Extras
- think about how to mount iridium here...
- Bring covers from Fairbanks to cover unitstrut ends like tennis balls.
Left to fix
- Decagon SRS sensors... test again in Fairbanks
- Thermal Conductivity sensors... figure out their deal...
- Review fieldbook
Kougarok M64
- Add ground control survey point if permitted