Difference between revisions of "2016 NGEE September Nome Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
(Replaced content with "* Add ground control survey point if permitted")
Line 1: Line 1:
 +
===Teller Bottom===
 +
====In Nome Storage:====
 +
* jumpers for last battery
 +
* soil sampling cylinders for soil pit
 +
 +
====At Site====
 +
* duct seal for all connections
 +
* soil pit sensors in large actionpacker
 +
 +
====Extras====
 +
* think about how to mount iridium here...
 +
*Bring covers from Fairbanks to cover unitstrut ends like tennis balls.
 +
 +
====Left to fix====
 +
* Decagon SRS sensors... test again in Fairbanks
 +
* Thermal Conductivity sensors... figure out their deal...
 +
* Review fieldbook
 +
 +
===Kougarok M64===
 
* Add ground control survey point if permitted
 
* Add ground control survey point if permitted

Revision as of 17:16, 30 August 2016

Teller Bottom

In Nome Storage:

  • jumpers for last battery
  • soil sampling cylinders for soil pit

At Site

  • duct seal for all connections
  • soil pit sensors in large actionpacker

Extras

  • think about how to mount iridium here...
  • Bring covers from Fairbanks to cover unitstrut ends like tennis balls.

Left to fix

  • Decagon SRS sensors... test again in Fairbanks
  • Thermal Conductivity sensors... figure out their deal...
  • Review fieldbook

Kougarok M64

  • Add ground control survey point if permitted