Line 1: | Line 1: | ||
− | ===Teller Bottom=== | + | ===Teller Bottom @ TL_DS_1=== |
+ | ====To Do:==== | ||
+ | * Get SRS sensors running | ||
+ | * Get Thermal Conductivity sensors running | ||
+ | * Jumper for batteries | ||
+ | * Pack up Surface Water Station for winter | ||
+ | * Duct seal up all instrument box holes | ||
+ | |||
====In Nome Storage:==== | ====In Nome Storage:==== | ||
* jumpers for last battery | * jumpers for last battery | ||
* soil sampling cylinders for soil pit | * soil sampling cylinders for soil pit | ||
+ | * Cable spools for Pressure transducers | ||
====At Site==== | ====At Site==== | ||
Line 10: | Line 18: | ||
====Extras==== | ====Extras==== | ||
* think about how to mount iridium here... | * think about how to mount iridium here... | ||
− | *Bring covers from Fairbanks to cover unitstrut ends like tennis balls. | + | * Bring covers from Fairbanks to cover unitstrut ends like tennis balls. |
====Left to fix==== | ====Left to fix==== | ||
Line 16: | Line 24: | ||
* Thermal Conductivity sensors... figure out their deal... | * Thermal Conductivity sensors... figure out their deal... | ||
* Review fieldbook | * Review fieldbook | ||
+ | |||
+ | ===Teller Top @ TL_IS5=== | ||
+ | ====Remaining To Do for fall==== | ||
+ | * Bring out a charge controller for solar panel | ||
+ | * soil samples from soil pit | ||
+ | * soil pit sensors are in a large actionpacker next to tower. | ||
===Kougarok M64=== | ===Kougarok M64=== | ||
* Add ground control survey point if permitted | * Add ground control survey point if permitted | ||
+ | |||
+ | ===Skookum Pass=== | ||
+ | * Add Satellite Components | ||
+ | |||
+ | ===Kougarok Old Sites=== | ||
+ | * Download data over the radio network |
Revision as of 18:24, 30 August 2016
Contents
Teller Bottom @ TL_DS_1
To Do:
- Get SRS sensors running
- Get Thermal Conductivity sensors running
- Jumper for batteries
- Pack up Surface Water Station for winter
- Duct seal up all instrument box holes
In Nome Storage:
- jumpers for last battery
- soil sampling cylinders for soil pit
- Cable spools for Pressure transducers
At Site
- duct seal for all connections
- soil pit sensors in large actionpacker
Extras
- think about how to mount iridium here...
- Bring covers from Fairbanks to cover unitstrut ends like tennis balls.
Left to fix
- Decagon SRS sensors... test again in Fairbanks
- Thermal Conductivity sensors... figure out their deal...
- Review fieldbook
Teller Top @ TL_IS5
Remaining To Do for fall
- Bring out a charge controller for solar panel
- soil samples from soil pit
- soil pit sensors are in a large actionpacker next to tower.
Kougarok M64
- Add ground control survey point if permitted
Skookum Pass
- Add Satellite Components
Kougarok Old Sites
- Download data over the radio network