Difference between revisions of "SS Site Visit 2017-12-15"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
 (Created page with "* Replaced Tower LI7200 and updated calibration & software both on unit and windows version * reconnected power and tubing and everything looks good to me. * removed fores flo...")  | 
				|||
| Line 18: | Line 18: | ||
* The tower wifi antenna needs replacing.  Do this next visit.  The coax is weathered and fraying.  | * The tower wifi antenna needs replacing.  Do this next visit.  The coax is weathered and fraying.  | ||
* all met sensors look good.  | * all met sensors look good.  | ||
| + | * cleared snow off all sky cam  | ||
Latest revision as of 13:57, 15 December 2017
- Replaced Tower LI7200 and updated calibration & software both on unit and windows version
 - reconnected power and tubing and everything looks good to me.
 - removed fores floor LI7200
 - removed forest floor CNR4
 - added newly calibrated CNR4 to forest floor tripod
 - sent new program with updated calibration coefficients for this CNR4 to the data logger
 - left forest floor li7200 wires in place but covered with a bag
 - for tools needed:
- phillips screwdriver
 - campbell phillips screwdriver
 - campbell flat screwdriver
 - crescent wrench
 - pocket scissors
 - electrical tape
 
 - left the vertical stud for the li7200 installed.
- the machine screws for it are in the shed on the forest floor toughbook
 - brought back to town the air intake for this to keep it out of the weather.
 
 - The tower wifi antenna needs replacing. Do this next visit. The coax is weathered and fraying.
 - all met sensors look good.
 - cleared snow off all sky cam