Line 7: | Line 7: | ||
[[2018 NGEE Nome September Trip]] | [[2018 NGEE Nome September Trip]] | ||
* SR50A transducer replacement (fall activity) | * SR50A transducer replacement (fall activity) | ||
− | * bring out one step stool to level teller bottom radiometer. | + | * (2019) bring out one step stool to level teller bottom radiometer. |
− | * bring out tap, die, drill, drill bit, screw for teller bottom radiometer. | + | * (2019) bring out tap, die, drill, drill bit, screw for teller bottom radiometer. |
** screw... | ** screw... | ||
* '''also replace cnr4 desiccant since the unit didn't look like it was sealing right with this missing screw.''' | * '''also replace cnr4 desiccant since the unit didn't look like it was sealing right with this missing screw.''' | ||
* '''Bring out additional desiccant? for box''' | * '''Bring out additional desiccant? for box''' | ||
* '''Teller SW desiccant replacement''' | * '''Teller SW desiccant replacement''' | ||
− | * Redrill hole for C1 Grid temperature probe | + | * (2019) Redrill hole for C1 Grid temperature probe |
** what is needed for this? | ** what is needed for this? | ||
* Measure Creek Flow | * Measure Creek Flow | ||
− | ** salt slug, n= | + | ** salt slug, n=2 samples of 50g / known volume of water |
* Re-level radiometers | * Re-level radiometers | ||
+ | * polish radiometer domes | ||
* Measure thermistors resistances at Teller Bottom and add them to fieldbook. | * Measure thermistors resistances at Teller Bottom and add them to fieldbook. | ||
** There are a couple with a 0.5C offset at spring freezing point so I think they may be failing and or something... | ** There are a couple with a 0.5C offset at spring freezing point so I think they may be failing and or something... | ||
Line 25: | Line 26: | ||
* 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod | * 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod | ||
* I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness. | * I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness. | ||
+ | * finish surveying vegetation plots | ||
====Kougarok==== | ====Kougarok==== | ||
− | * | + | * bring out a serial cable for box (removed it in fall 2018) |
+ | * get a compass reading on anemometer | ||
+ | ** leave a compass in the box | ||
====Teller SW Flow==== | ====Teller SW Flow==== | ||
− | + | * left a metal meter stick at the site | |
− | |||
− | |||
− | |||
− | |||
* fieldbook | * fieldbook | ||
* YSI conductivity meter | * YSI conductivity meter | ||
** manual | ** manual | ||
* electrical tape | * electrical tape | ||
− | |||
==== Radiation Level:==== | ==== Radiation Level:==== | ||
Line 45: | Line 44: | ||
* a bit of wood to provide better base for step ladder | * a bit of wood to provide better base for step ladder | ||
* phillips screwdriver for level | * phillips screwdriver for level | ||
+ | |||
==== Radiation Desiccant Swap:==== | ==== Radiation Desiccant Swap:==== |
Revision as of 12:23, 29 September 2018
Contents
To Buy
- Step ladder for teller bottom
- 12 volt Trimble cable
Seward Peninsula
- SR50A transducer replacement (fall activity)
- (2019) bring out one step stool to level teller bottom radiometer.
- (2019) bring out tap, die, drill, drill bit, screw for teller bottom radiometer.
- screw...
- also replace cnr4 desiccant since the unit didn't look like it was sealing right with this missing screw.
- Bring out additional desiccant? for box
- Teller SW desiccant replacement
- (2019) Redrill hole for C1 Grid temperature probe
- what is needed for this?
- Measure Creek Flow
- salt slug, n=2 samples of 50g / known volume of water
- Re-level radiometers
- polish radiometer domes
- Measure thermistors resistances at Teller Bottom and add them to fieldbook.
- There are a couple with a 0.5C offset at spring freezing point so I think they may be failing and or something...
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?
- sort of some additional homework is that I saw instability in a number of thermistors when measuring up top. I suspect but haven't verified that this instability is an indicator for the wonky temperatures seen in the data but need to confirm.
- 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod
- I should do some experiments with the thermal conductivity thermistors in office/lab to see if I can reduce the noisiness.
- finish surveying vegetation plots
Kougarok
- bring out a serial cable for box (removed it in fall 2018)
- get a compass reading on anemometer
- leave a compass in the box
Teller SW Flow
- left a metal meter stick at the site
- fieldbook
- YSI conductivity meter
- manual
- electrical tape
Radiation Level:
- step ladder
- a bit of wood to provide better base for step ladder
- phillips screwdriver for level
Radiation Desiccant Swap:
- Step ladder
- small CSI phillips
- K&Z desiccant pack
- anti-corrosion goo
Teller Top Soil Temperatures
- Volt meter
- fieldbook
- learned but need to confirm that the thermistors with a capacitance are ones that are unstable and failing.
Utqiagvik
- Intensive Site A HMP155 failed (3.5m)
- Intensive Site B HMP155 failed (1.4m)
- Intensive Site C HMP155 failed
- need to replace the network cable running from the computer to the network switch. It cuts out with minimal bumping.... but station is finally back online!!!
- Site A SR50A transducers have failed
- some subsurface items are beginning to fail.
- bring up clear tape and a biz card to label the computer
- bring up the nuc plate and wood screws and other screw packet to mount nuc to wall