Difference between revisions of "2018 NGEE Nome June Trip"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 17: | Line 17: | ||
* Re-level radiometer & precip bucket  | * Re-level radiometer & precip bucket  | ||
* Teller SW desiccant replacement  | * Teller SW desiccant replacement  | ||
| + | * Teller SW: look at moving solar panel stand up to current station location  | ||
* Install Divers on bottom of hill sites  | * Install Divers on bottom of hill sites  | ||
* Data Download  | * Data Download  | ||
| Line 45: | Line 46: | ||
===Friday 6/15: Loose ends===  | ===Friday 6/15: Loose ends===  | ||
* Fly out Friday evening  | * Fly out Friday evening  | ||
| + | |||
| + | ===Things in UAF Storage to grab for trip===  | ||
| + | * Driving safety gear  | ||
| + | ** tow rope  | ||
| + | ** air pump  | ||
| + | ** tire patch kit (though might buy another)  | ||
| + | ** jumper cables  | ||
| + | * garbage bag for trash  | ||
| + | * pepper spray  | ||
| + | * ladder for teller top site  | ||
| + | * tape measure for creek cross section  | ||
| + | * Teller Creek markers for discharge measurements:  | ||
| + | ** 6 - 9 small rebar to outline: Salt deployment point, PT location, Salt Measurement point  | ||
| + | ** pick up some colored electrical tape, too to mark these  | ||
| + | * tool bag for station work  | ||
| + | |||
===Anchorage Remaining Prep===  | ===Anchorage Remaining Prep===  | ||
| Line 51: | Line 68: | ||
* bring out a tape measure for creek stage  | * bring out a tape measure for creek stage  | ||
* Finish looking at data.  | * Finish looking at data.  | ||
| + | * folding tape for creek measurement (to stash at station)  | ||
| + | |||
| + | ===Potential Bonus Activities===  | ||
| + | * Multiple Discharge Measurements at Teller Creek  | ||
| + | *  | ||
Revision as of 11:12, 5 June 2018
Contents
Monday 6/11
- Nathan W arrives, staying at Dredge
- Reservation Confirmation Number: 479315
 
 
Tuesday 6/12: Teller Day 1
- Bob Busey arrives
- Flight: Alaska 151
 - Nome (OME) on Tue, Jun 12 at 7:49 am
 
 - Staying at Dredge
- Reservation Confirmation Number: 964080
 
 - head out to Teller
 - download station data at bottom
 - Teller Bottom Program Send
 - Replace broken precip bucket @ Teller Bottom
 - Replace Desiccant deal for Teller Bottom radiometer
 - Re-level radiometer & precip bucket
 - Teller SW desiccant replacement
 - Teller SW: look at moving solar panel stand up to current station location
 - Install Divers on bottom of hill sites
 - Data Download
 - Measure Flow in the Creek
- (I'm hoping LANL salt diffusion method here).
 - Flow intercomparison experiment. We will measure several different ways.
 
 
Wednesday 6/13: Teller Day 2
- Replace Desiccant deal for Teller Top radiometer
- Bring out ladder
 
 - Re-level radiometer
 - Data Download @ Teller Top
 - Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
 - Also related: perhaps add a second string up at teller top?
 
 - Finish deploying divers with Nathan
 
Thursday 6/14: Kougarok Day 1
- Replace broken precip bucket @ Koug m64
 - Data Download
 - Replace Desiccant deal for radiometer
 - Re-level radiometer
- bring out two longer pipes to steady the radiomter pole
 
 - Bring out additional desiccant?
 - Put out divers for wells with Nathan
 - Stretch goal: download old UAF station data by radio at end of road
 
Friday 6/15: Loose ends
- Fly out Friday evening
 
Things in UAF Storage to grab for trip
- Driving safety gear
- tow rope
 - air pump
 - tire patch kit (though might buy another)
 - jumper cables
 
 - garbage bag for trash
 - pepper spray
 - ladder for teller top site
 - tape measure for creek cross section
 - Teller Creek markers for discharge measurements:
- 6 - 9 small rebar to outline: Salt deployment point, PT location, Salt Measurement point
 - pick up some colored electrical tape, too to mark these
 
 - tool bag for station work
 
Anchorage Remaining Prep
- calibrate replacement tipping buckets
 - put box of gear together for trip
 - bring out a tape measure for creek stage
 - Finish looking at data.
 - folding tape for creek measurement (to stash at station)
 
Potential Bonus Activities
- Multiple Discharge Measurements at Teller Creek