NGEE
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
 - Programs:
 - NGEE Site A Instrumentation History
 - NGEE Site B Instrumentation History
 - NGEE Site C Instrumentation History
 - NGEE Site D Instrumentation History
 
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
 - Thermistor Probe Calibrations ([1])
 - Thermistor Strings and Triple Calibrations ([2])
 - Timezone - UTC
 - PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403
 
Lists
Trips
- NGEE April 11 2012 Trip
 - NGEE September 3 2012 Trip
 - NGEE September 24 2012 Trip
 - NGEE Barrow Wiring Layout
 - NGEE Barrow Intensive Sites Initial Wiring
 - NGEE Barrow 2013 Boring Trip
 - [NGEE Barrow 2013 Site Install Trip 5/7
 - NGEE Barrow 2013 Site Install Trip June
 - NGEE Barrow 2013 Site D Install Trip August 2013
 - March 2014 Barrow
 - NGEE Barrow Remainder Items
 - CPCRW 2012-10-12
 - CPCRW 2013-07-15