NGEE
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
- Programs:
- NGEE Site A Instrumentation History
- NGEE Site B Instrumentation History
- NGEE Site C Instrumentation History
- NGEE Site D Instrumentation History
- Backup Instrumentation
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
- Thermistor Probe Calibrations ([1])
- Thermistor Strings and Triple Calibrations ([2])
- Timezone - UTC
- PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403
Lists
Trips
- NGEE April 11 2012 Trip
- NGEE September 3 2012 Trip
- NGEE September 24 2012 Trip
- NGEE Barrow Wiring Layout
- NGEE Barrow Intensive Sites Initial Wiring
- NGEE Barrow 2013 Boring Trip
- [NGEE Barrow 2013 Site Install Trip 5/7
- NGEE Barrow 2013 Site Install Trip June
- NGEE Barrow 2013 Site D Install Trip August 2013
- March 2014 Barrow
- August 2014 Barrow
- NGEE Barrow Remainder Items
- CPCRW 2012-10-12
- CPCRW 2013-07-15