2016 June Nome Trip
Revision as of 13:21, 2 June 2016 by 137.229.92.185 (talk)
On the To Do list:
- Anvil City School station needs a propeller for the 05103
- we couldn't connect to the datalogger last trip
- Switch the current SR50 to a SR50A and give Bill the old SR50.
- Anvil logger could be upgraded to pakbus like we did at Skookum
- K2 site download the storage module.
- Teller
- Stream measurement
- put up 3m tripod
- move surface water sensors to their own logger
- download and shutdown snow temperature logger
- disassemble and bring back to town
- download data from hill top
- download data from gaging station
- C1-grid
- RH is not matching well, check sensors
- Blueberry site
- can we take down the tower, removing the lowest section?... might that be a three person job?
- check out WS at 1m, its reading very low in comparison to 10m
- Kougarok 10m Met
- snow sensor?
- shorten tower?
- I have in my notes that the tower is blistering so we should bring unistrut and ubolts for next trip
- 1m WS and temp/RH are too low to the ground, raise them up
- check out battery data
- Kenji's site = bear creek
- hobo thermister wires broken but still reading resistances
- bring extension wires, pipe cutter, cr10x, conduit, hose clamps, instrument box from K1
- figure out thermister equation