Gcl

From IARC 207 Wiki
Revision as of 10:14, 3 July 2007 by imported>Ken
Jump to navigation Jump to search

Green Cabin Lake

TODO list

  • install RM Young on cross-arm mount


site logs

7 June 2007, Ken I., Dan R.

  • installed electric fence with 4 posts
  • checked logger (OK) using keypad
  • poured water into rain gauge (OK); precip record at 1635 AKST (and

hourly total) should be ignored as data (in post-processing)

  • wx: warm wind from SSE, about 15 to 20 knots. Dry, no rain.
  • measured tripod/stand mast riser at 1-1/2" diameter (needed for

cross-arm mount)