SS Site Visit 2017-09-12
Revision as of 12:21, 14 September 2017 by 137.229.18.212 (talk)
Visited 9/12 and 9/14
- Check out 1m AT/RH
- 9/14 replaced with borrowed unit from toolik
- Bring out battery for UPS system
- double-check battery voltages next time out.
- toughbook
- replaced bottom two wind sensors with new units
- sending old units for recalibration
- Tour with Go
- put small toughbook on UPS system
- 9/14 changed all MD485s at site to Pakbus protocol rather than transparent to see if this helps with data retrieval using python.
- worked a bit on boardwalk
- pounded in grounding rod
- hooked second laptop to UPS