NGEE To Do Next Visit
Revision as of 14:39, 4 June 2018 by 66.58.227.216 (talk)
Seward Peninsula
- Replace broken precip bucket @ Teller Bottom
- Replace broken precip bucket @ Koug m64
- Replace Desiccant deal for radiometers
- SR50A transducer replacement
- Bring out additional desiccant?
- Teller SW desiccant replacement
- Data Download
- Redrill hole for C1 Grid temperature probe
- Teller Bottom Program Send
- Measure Creek Flow
- Re-level radiometers
- Put out Divers for wells with Nathan
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?
Utqiagvik
- Intensive Site C HMP155 failed