NGEE To Do Next Visit

From IARC 207 Wiki
Jump to navigation Jump to search

Seward Peninsula

2018 NGEE Nome June Trip

  • Replace broken precip bucket @ Teller Bottom
  • Replace broken precip bucket @ Koug m64
  • Replace Desiccant deal for radiometers
  • SR50A transducer replacement (fall activity)
  • Bring out additional desiccant?
  • Teller SW desiccant replacement
  • Data Download
  • Redrill hole for C1 Grid temperature probe
  • Teller Bottom Program Send
  • Measure Creek Flow
  • Re-level radiometers
  • Put out Divers for wells with Nathan
  • Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
    • Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
    • Also related: perhaps add a second string up at teller top?
  • 6/11/2018 In Fairbanks... down in 106 / the basement there is a box of 12" nails. Would be good to grab three for the Teller SW solar panel tripod
  • Koug M64 Ngee tipping bucket stand is 1" aluminum pipe (verified by photo)
  • Teller tipping bucket stands: 3/4" aluminum pipe (it appears)

Radiation Level:

  • step ladder
  • a bit of wood to provide better base for step ladder
  • phillips screwdriver for level

Radiation Desiccant Swap:

  • Step ladder
  • small CSI phillips
  • K&Z desiccant pack
  • anti-corrosion goo

Teller Top Soil Temperatures

  • Volt meter
  • fieldbook

Teller bottom precip bucket swap

  • small csi phillips
  • desiccant pack
  • 2 red butt splices
  • toggle bolts
  • 5/16" nut driver

Utqiagvik

  • Intensive Site C HMP155 failed