2018 NGEE Nome June Trip
Revision as of 08:43, 22 May 2018 by 137.229.92.213 (talk)
Contents
Monday 6/11
- Nathan W arrives
Tuesday 6/12: Teller Day 1
- Bob Busey arrives
- head out to Teller
- download station data at bottom
- Teller Bottom Program Send
- Replace broken precip bucket @ Teller Bottom
- Replace Desiccant deal for Teller Bottom radiometer
- Re-level radiometer & precip bucket
- Teller SW desiccant replacement
- Install Divers on bottom of hill sites
- Data Download
- Measure Flow in the Creek
Wednesday 6/13: Teller Day 2
- Replace Desiccant deal for Teller Top radiometer
- Bring out ladder
- Re-level radiometer
- Data Download @ Teller Top
- Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
- Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
- Also related: perhaps add a second string up at teller top?
Thursday 6/14: Kougarok Day 1
- Replace broken precip bucket @ Koug m64
- Data Download
- Replace Desiccant deal for radiometer
- Re-level radiometer
- Bring out additional desiccant?
- Measure Creek Flow
- Re-level radiometers
- Put out Divers for wells with Nathan