2018 NGEE Nome June Trip

From IARC 207 Wiki
Revision as of 08:46, 22 May 2018 by 137.229.92.213 (talk)
Jump to navigation Jump to search

NGEE To Do Next Visit

Monday 6/11

  • Nathan W arrives

Tuesday 6/12: Teller Day 1

  • Bob Busey arrives
  • head out to Teller
  • download station data at bottom
  • Teller Bottom Program Send
  • Replace broken precip bucket @ Teller Bottom
  • Replace Desiccant deal for Teller Bottom radiometer
  • Re-level radiometer & precip bucket
  • Teller SW desiccant replacement
  • Install Divers on bottom of hill sites
  • Data Download
  • Measure Flow in the Creek

Wednesday 6/13: Teller Day 2

  • Replace Desiccant deal for Teller Top radiometer
    • Bring out ladder
  • Re-level radiometer
  • Data Download @ Teller Top
  • Measure thermistors at Teller Top and Teller Bottom and add them to fieldbook.
    • Related: I'm wondering if the delay between measurements should be increased for the thermistor measurements.
    • Also related: perhaps add a second string up at teller top?
  • Finish deploying divers with Nathan

Thursday 6/14: Kougarok Day 1

  • Replace broken precip bucket @ Koug m64
  • Data Download
  • Replace Desiccant deal for radiometer
  • Re-level radiometer
  • Bring out additional desiccant?
  • Put out divers for wells with Nathan
  • Stretch goal: download old UAF station data by radio at end of road