NGEE
Revision as of 17:30, 10 April 2013 by 137.229.92.213 (talk)
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring (Out of date for the 2013 Install at the moment)
- Programs :
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
- Thermistor Probe Calibrations ([1])
- Thermistor Strings and Triple Calibrations ([2])
- Timezone - UTC
- PakBus IDs - A = 400; B = 401; C = 402; D = 403