NGEE September 24 2012 Trip

From IARC 207 Wiki
Revision as of 09:52, 22 August 2012 by 137.229.92.243 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Sep field work 2012

  • Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.
  • Busey could also arrive on the evening on Monday Sep 24.
  • People: Bob Busey, Anna Liljedahl (Cathy may be around from Sep 28 or soon after)


Itinerary

DAY 1 ( 1 person)

  • Water level wells @ all sites
    • lowering installed wells
    • clean each wire/sensor
    • manually measure the water level in installed wells
    • download data from water level loggers
    • thaw depths at installed wells

DAY 2 and 3 (2 people)

  • Water level wells @ all sites
    • level surveying of water levels/wells (*** WE NEED TO FIND A LEVEL***)

DAY 4 (2 people)

  • Temperature/soil moisture @ grid site (Site C)
    • download and maintain Campbell logger
    • download all 20 Hobo loggers
    • replace malfunctioning Hobo loggers
    • thaw depths at the 29 sites

DAY 5 and 6 (2 people)

  • thaw depth survey along transects/grids at each site (site A through D)
    • CRAIG, SUSAN'S TEAM, NEED TO DGPS THAW DEPTH TRANSECTS
  • change the view of the webcam at the Control Shed

DAY 7 (2 people)

  • Installation of additional CSI snow depth, Hobo soil temp and Hobo snow temp sensors


Potential Extra Items

  • Install power from Control Shed to site C (I am not sure the power is available to us??)
  • Install wireless communication to grid site (requires power)